BONDING OF CMC TUBES TO LOW CTE INSERTS Solicitation ID/Procurement Identifier: 80NSSC824767Q Ultimate Completion Date: Fri Sep 29 17:00:00 GMT 2023
Recent, relevant experience in all areas should be provided.Bonding: provide your bonding capacity per contract and aggregate. Bonding for each project will be at the task order level.
Bonding capability (construction bonding level per single contract/task order and aggregate construction bonding level, both expressed in dollars along with current available bonding capacity).4. Past performance information that documents the respondents experience performing projects similar to that described above. The referenced projects should be of similar scope and magnitude and should have been completed within the last ten (10) years.
Provide construction bonding level per single contract/task order. Provide the aggregate sum total construction bonding level. Provide both capabilities which must be expressed in U.S. dollars; along with current available bonding capacity.4.
Capability (construction bonding level per contract and aggregate construction bonding level, both expressed in dollars).
level per contract and aggregate construction bonding level, both expressed in dollars) via letter from the bonding company.
The resulting contract will not include bonding or insurance. Each entity must assess their individual project to determine the need for bonding and insurance, including without limitation such workers' compensation insurance as may be required by state or local low or policy or confirmation of coverage, as applicable, from the vendor.
Bonding Capacity: Provide your surety’s name, your maximum bonding capacity per project and your aggregate maximum bonding capacity. The aggregate bonding capacity must be no less than $27.6M to be deemed acceptable for this notice.4.
Performance and Payment bonding is a requirement for this procurement and Liquidated Damages are applicable. The acquisition will be a negotiated, best-value procurement using the Contracting by Negotiation process prescribed in FAR 15.101-2. The source selection process will be based on a Lowest Price, Technically Acceptable (LPTA) evaluation. The evaluation factors are: 1) Bonding and Certifications, 2) Past Performance, and 3) Price.