  • HOT BONDING TECH REP

    Type : Bid Notification

    Due : 07 Nov, 2022 (18 months ago)
    Posted : 18 months ago
    Started : 01 Nov, 2022 (18 months ago)

    All emailed quotes shall have 70Z04023Q60311Y00 in the subject of the email.The United States Coast Guard Surface Forces Logistics Center has a requirement for the following items:ITEM 1: HOT BONDING / SEAL ASSEMBLYTECH REP TO HOT BOND INFLATABLE SEAL ANDASSEMBLE SEALS FOR THE CGC DANIEL, TARR HERE AT THE YARD INBALTIMORE MD OR OR ABOUT 12/01/22QUANTITY: 01 JOB*DELIVERY PRICE (IF ANY) SHALL BE INCLUDE IN THE QUOTEVENDOR MUST BE CAPABLE OF STARTING

    From: Federal Government (Federal)

  • Seal Assembly and Hot Bonding on CGC Joseph Doyle

    Type : Bid Notification

    Due : 16 Mar, 2023 (13 months ago)
    Posted : 14 months ago
    Started : 01 Mar, 2023 (14 months ago)

    OF SHAFT SEALDESCRIPTION: HOT BONDING / SEAL ASSEMBLY TECH REP TO HOT BOND INFLATABLE SEAL AND ASSEMBLE SEALS FOR THE CGC JOSEPH DOYLE HERE AT THE YARD IN BALTIMORE MD ON OR ABOUT 4/1/23Line Total:Estimated Performance Date:*Services are Required by 4/1/2023*Place of Performance: U.S.

    From: Federal Government (Federal)

  • Butler Tech LeSourdsville Campus Electrical Project

    Type : Bid Notification

    Due : 31 Mar, 2023 (13 months ago)
    Posted : 13 months ago
    Started : 16 Mar, 2023 (13 months ago)

    CONTRACTOR TO PROVIDE GROUNDING AND BONDING AS REQUIRED FOR ELECTRICAL SYSTEMS. GROUNDING AND BONDING IS CONSIDERED MEANS AND METHODS OF CONSTRUCTION, AND SHOULD BE COMPLETED BY THE ELECTRICAL CONTRACTOR IN ACCORDANCE WITH NEC 250. GAS PIPING SYSTEMS MUST BE BONDED PER UTILITY PROVIDER'S INSTALLATION GUIDELINES WHERE REQUIRED. I. REFER TO NEC SECTION 630.11 (A) FOR WIRE SIZING REQUIREMENTS FOR WELDERS. KEYED SHEET NOTES 1.

    From: Butler Technology and Career Development Schools (School)

  • 63--CONTROL UNIT,ALARM, IN REPAIR/MODIFICATION OF

    Type : Bid Notification

    Due : 19 May, 2022 (23 months ago)
    Posted : about 2 years ago
    Started : 19 Apr, 2022 (about 2 years ago)

    Verify Bonding per Drawing 212907. q. Solder per Drawing 212904, 212906, 212750, 212649, 212652, 212654, 523985, 2212916, 212918, 212856, 212928, 212926, 212980, and 212982. r. Plating per Drawing 212903, 212905, 212749, 212647, 212651, 523986, 212965, 212855, 212927, 212925, 212979, 212987, 212986, and 212981. s. Connections and Wraps per Drawing W/L 212707. t.

    From: Federal Government (Federal)

  • Inspection and Overhaul of Boat Davit onboard CGC Neah Bay

    Type : Bid Notification

    Due : 20 Jun, 2022 (22 months ago)
    Posted : 23 months ago
    Started : 07 Jun, 2022 (23 months ago)

    The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):Task #1.3.1.2 Tech Rep. Not applicable.3.1.3 Protective measures.  The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. 

    From: Federal Government (Federal)

  • CONRAC Facilities Refurbishment at Destin-Fort Walton Beach Airport

    Type : Bid Notification

    Due : 20 Jan, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 05 Jan, 2021 (about 3 years ago)

    Bonding connections shall be made as close as practical to the equipment ground bus. B.

    From: Okaloosa (County)

  • Construct Okaloosa County Water and Sewer Field Offices

    Type : Bid Notification

    Due : 09 Dec, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 24 Nov, 2020 (about 3 years ago)

    Bonding Straps and Jumpers: Install in locations accessible for inspection and maintenance, except where routed through short lengths of conduit. 1. Bonding to Structure: Bond straps directly to basic structure, taking care not to penetrate any adjacent parts. 2. Bonding to Equipment Mounted on Vibration Isolation Hangers and Supports: Install so vibration is not transmitted to rigidly mounted equipment. 3.

    From: Okaloosa (County)