Type : Bid Notification
Due : 08 Apr, 2024 (in 10 days)
Posted : 12 days ago
Started : 15 Mar, 2024 (13 days ago)
The method of installation will be trenchless installation on IDOT right-of-way, with bore pits placed outside of state right-of-way. New inspection tubes will be placed at right-of-way line as per Road Standard DR-302. The depth of installation is approximately 5-feet.