Search results for: bore inspection

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 2 of 2
  • Tile line project along IA 4 Roadway

    Type : Bid Notification

    Due : 08 Apr, 2024 (in 10 days)
    Posted : 12 days ago
    Started : 15 Mar, 2024 (13 days ago)

    The method of installation will be trenchless installation on IDOT right-of-way, with bore pits placed outside of state right-of-way. New inspection tubes will be placed at right-of-way line as per Road Standard DR-302. The depth of installation is approximately 5-feet.

    From: Iowa Department of transportation (Transportation)