Search results for: breaker installation project

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 9 of 9
  • Electrical Equipment and Components for Breaker Installation Project

    Type : Bid Notification

    Due : 26 Aug, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 24 Aug, 2021 (about 2 years ago)

    Reference Document Solicitation 89503121QWA000180The Department of Energy, Western Area Power Administration (WAPA), Desert Southwest (DSW) Region, issues this AMENDMENT TO INCORPORATE A QUESTION AND ANSWER  for “Electrical Equipment and Components” required for Breaker Installation Project. Please refer to the attachment for additional details relative to this amendment.

    From: Federal Government (Federal)

  • Supply and Installation of Main Electrical Breakers

    Type : Bid Notification

    Due : 26 Jun, 2023 (10 months ago)
    Posted : 10 months ago
    Started : 12 Jun, 2023 (10 months ago)

    Supply and Installation of Main Electrical Breakers Project Description :D2. SCOPE OF WORK D2.1 The Work to be done under the Contract shall consist of supply and installation of Main Electrical breaker at for four (4) City of Winnipeg Arenas.

    From: MerX (Federal)

  • 28--INSTALLATION KIT

    Type : Bid Notification

    Due : 23 Jun, 2023 (10 months ago)
    Posted : 10 months ago
    Started : 12 Jun, 2023 (10 months ago)

    Proposed procurement for NSN 2825014742279 INSTALLATION KIT: Line 0001 Qty 3 UI KT Deliver To: W1A8 DLA DISTRIBUTION By: 0230 DAYS ADO Approved source is 0EYA6 799001NKT. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Specifications, plans, or drawings are not available.

    From: Federal Government (Federal)

  • Construction Natural Gas Generation Plant / Microgrid System - Fort Stewart

    Type : Bid Notification

    Due : 12 Oct, 2023 (6 months ago)
    Posted : 7 months ago
    Started : 27 Sep, 2023 (7 months ago)

    Installation and Commissioning of Microgrid systems6. Installation of necessary breakers and switchgearb. Projects similar in size to this project include: Construction of a new natural gas generation system which meets or exceeds the following size elements:1. Installation & construction of Natural Gas fired generators able to handle loads of 0.5 MW – 9.0MW c. Based on the information above, for each project submitted, include:1.

    From: Federal Government (Federal)

  • Automation of traffic arm barriers, Camp Darby, Tirrenia (Pisa), Italy

    Type : Award

    Due : 06 Jun, 2018 (about 5 years ago)
    Posted : about 6 years ago
    Started : 03 Jul, 2018 (about 5 years ago)

    The project will include the installation of installation of four (4) automatic arm barriers, including new concrete basements; installation of new push buttons for the barriers' control; installation of new cable ducts, manholes, conduits and boxes to route new power and control cables; installation of new circuit breakers to feed the new barriers.FUNDING: The project is funded (basic project)LOCATION OF THE WORK: The site of the proposed work is

    From: Federal Government (Federal)

  • 59--Electrical Upgrades Project (Medium and Low Voltage Switchgear) at the U.S. EPA

    Type : Bid Notification

    Due : 06 Sep, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 22 Aug, 2018 (about 5 years ago)

    Contract with the equipment manufacturer (GE or approved equal)) for all services related to upgrading the main-tie-main breaker switching controls as described in the project documents. Provide installation, conduit, and wiring of a new Remote Operators Panel (to be furnished by GE, or approved equal, under this project) in the 12.47 kV switchgear room. Provide 120 volt power to the new panel from existing panel STDBYPP1.

    From: Federal Government (Federal)