Type : Contract
George Washington Bridge – Underside of Lower Level Structure - Priority Repairs Agency: New York State Contract Reporter Category:Miscellaneous - Construction Issue Date:04/04/2022 Due Date: 04/26/2022 Ad Type:Contractor Ads
George Washington Bridge – Underside of Lower Level Structure - Priority Repairs Agency: New York State Contract Reporter Category:Miscellaneous - Construction Issue Date:04/04/2022 Due Date: 04/26/2022 Ad Type:Contractor Ads
Product Service Code:- Z2LB - REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS NAICS Code:- 238320 - Painting and Wall Covering Contractors Primary point of contact:- Adrienne Manuel Adrienne.C.Manuel@usace.army.mil Secondary point of contact:-
Installation of approximately 260 m of 450 mm ø SDR18 Fused PVC including 220 m aerial crossing of the Nechako River along the underside of the Highway 97 (John Hart) Bridge (material will be supplied by City). Installation of 14 - 450 mm ø Gate Valves (material will be supplied by City). Supply and Installation of appurtenances and chambers as shown on Contract Drawings.
County Commissioners seeks to contract with a qualified Contractor to repair several concrete spalling spots on the bridge superstructure, abutment walls, and underside of the bridge deck.
The CFRP wrap repairs only apply to the center span, not the two end spans.Access for repairs on the bridge underside will be limited, as there is typically 5 feet (approximate) of clearance from the bridge underside to the water surface of the creek.
The CFRP wrap repairs only apply to the center span, not the two end spans.Access for repairs on the bridge underside will be limited, as there is typically 5 feet (approximate) of clearance from the bridge underside to the water surface of the creek.
This Request for Quotations (“RFQ”) is an invitation by Halifax Regional Municipality (“HRM”) to prospective bidders to submit bids for the provision of enclosing and cleaning the underside of the HWY 111 Lake Banook bridge structure of bird droppings and other debris. Install netting around the existing girders, pier cap, beam seats and other... See more