Search results for: building and bwc

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 50
  • Property Management Services William Green Building and BWC Parking Garage

    Type : Contract

    Due : 30 Jun, 2025 (in 14 months)
    Posted : 2 months ago
    Started : 25 Jan, 2024 (3 months ago)

    Contract Name : Property Management Services William Green Building and BWC Parking Garage Amendment #4 Property Management Services William Green Building and BWC Parking Garage Amendment #4 Supplier : JONES LANG LASALLE AMERICAS Contract ID : CTR004332-A4 State Contract Number : CSP900822-1 Contract Sub-Type: Single Agency Contract

    From: Ohio (State)

  • BWC William Green Building Renovations

    Type : Bid Notification

    Due : 15 Apr, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 01 Apr, 2021 (about 3 years ago)

    See more details...

    From: Ohio Facilities Construction Commission (State)

  • PROPERTY MANAGEMENT SERVICES – WILLIAM GREEN BUILDING AND BWC PARKING GARAGE

    Type : Contract

    Due : 30 Jun, 2023 (10 months ago)
    Posted : about 3 years ago
    Started : 01 Jul, 2021 (about 2 years ago)

    PROPERTY MANAGEMENT SERVICES – WILLIAM GREEN BUILDING AND BWC PARKING GARAGE

    From: Ohio (State)

  • BWC Fire Pumps Replacement Project

    Type : Bid Notification

    Due : 20 Apr, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 05 Apr, 2022 (about 2 years ago)

    There are 33 stories above grade, and two stories below grade. The highest roof level is 557’-6” above grade. The WGB’s fire protection system is currently served by two diesel-driven fire pumps. The engines are both building original and were manufactured by Detroit Diesel. They are connected to Weinman split case pumps, which are designed to flow water to the high-rise zone (Levels 14-33) and the low-rise zone (Levels B2-13).

    From: Ohio Facilities Construction Commission (State)

  • BWC Fire Pumps Replacement Project

    Type : Bid Notification

    Due : 20 Apr, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 05 Apr, 2022 (about 2 years ago)

    There are 33 stories above grade, and two stories below grade. The highest roof level is 557’-6” above grade. The WGB’s fire protection system is currently served by two diesel-driven fire pumps. The engines are both building original and were manufactured by Detroit Diesel. They are connected to Weinman split case pumps, which are designed to flow water to the high-rise zone (Levels 14-33) and the low-rise zone (Levels B2-13).

    From: Ohio Facilities Construction Commission (State)

  • BWC Lausche Tenant Improvements

    Type : Bid Notification

    Due : 21 Aug, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 08 Aug, 2018 (about 5 years ago)

    Project Description The Ohio Bureau of Workers’ Compensation (BWC) currently occupies two locations in the greater Cleveland area: private- sector leased office space in Garfield Heights and Level 6 in the state-owned Lausche Building.

    From: Ohio Facilities Construction Commission (State)

  • BWC Lausche Tenant Improvements

    Type : Bid Notification

    Due : 21 Aug, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 08 Aug, 2018 (about 5 years ago)

    Project Description The Ohio Bureau of Workers’ Compensation (BWC) currently occupies two locations in the greater Cleveland area: private- sector leased office space in Garfield Heights and Level 6 in the state-owned Lausche Building.

    From: Ohio Facilities Construction Commission (State)