Search results for: building restroom and corridor

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 125
  • Administration Building Restroom and Corridor Renovations

    Type : Bid Notification

    Due : 16 Nov, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 19 Oct, 2021 (about 2 years ago)

    BidId=86 Pre-Bid Conference: 11/4/21 10:00 AM Pre-Bid Conference Open Responses: 11/16/21 Description: Administration Building Restroom and Corridor Renovations Attachments IFB 22001; Administration Building Restroom and Corridor Renovation.pdf   22001; Administration Building Restroom and Corridor Renovations 10/19/21 AttachmentSizeDescriptionPosted OnTypeIFB 22001; Administration Building Restroom and Corridor Renovation.pdf(206.87 KB)22001;

    From: Virginia (State)

  • Administration Building Restroom and Corridor Renovations

    Type : Bid Notification

    Due : 16 Nov, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 19 Oct, 2021 (about 2 years ago)

    BidId=86 Pre-Bid Conference: 11/4/21 10:00 AM Pre-Bid Conference Open Responses: 11/16/21 Description: Administration Building Restroom and Corridor Renovations Amendment/Cancellation Information: 22001; Addendum 1, Pre-Bid Sign-in and Agenda Attachments IFB 22001; Administration Building Restroom and Corridor Renovation.pdf   22001; Administration Building Restroom and Corridor Renovations 10/19/21 22001; Addendum 1 Combined.pdf   Addendum 1;

    From: Virginia (State)

  • Addendum No 1A - Summer Painting Revisions

    Type : Bid Notification

    Due : 17 Apr, 2024 (9 days ago)
    Posted : 20 days ago
    Started : 22 Mar, 2024 (1 month ago)

    o PAINT ALL OTHER BUILDINGS ACCENT 2 AT LOWER 5 BLOCKS; ACCENT 1 NEXT BLOCK UP; ACCENT 3 NEXT BLOCK UP; ACCENT 2 REMAINING INCLUDING PAINTABLE UPPER TRIM o PRESERVE SHIELD MURAL AT RESTROOM BUILDING – TERMINATE ACCENT STRIPING AT MURAL AT ANGLE TO CREATE DIAMOND BORDER; COVER GENERAL LETTERING o RESTROOMS NEW NEUTRAL; UPPER TRIM PIECE ACCENT 3; PARTIAL BLOCK ACCENT 1  ATHLETIC FACILITIES (OFF CAMPUS) o PRESSBOX - ACCENT 2 AT LOWER 5 BLOCKS; ACCENT

    From: Greenville County Schools (School)

  • Summer Painting 2024 at Multiple Locations

    Type : Bid Notification

    Due : 17 Apr, 2024 (9 days ago)
    Posted : 1 month ago
    Started : 29 Feb, 2024 (1 month ago)

    o PAINT ALL OTHER BUILDINGS ACCENT 2 AT LOWER 5 BLOCKS; ACCENT 1 NEXT BLOCK UP; ACCENT 3 NEXT BLOCK UP; ACCENT 2 REMAINING INCLUDING PAINTABLE UPPER TRIM o PRESERVE SHIELD MURAL AT RESTROOM BUILDING – TERMINATE ACCENT STRIPING AT MURAL AT ANGLE TO CREATE DIAMOND BORDER; COVER GENERAL LETTERING o RESTROOMS NEW NEUTRAL; UPPER TRIM PIECE ACCENT 3; PARTIAL BLOCK ACCENT 1  ATHLETIC FACILITIES (OFF CAMPUS) o PRESSBOX - ACCENT 2 AT LOWER 5 BLOCKS; ACCENT

    From: Greenville County Schools (School)

  • Jefferson High School Renovation & Restoration

    Type : Bid Notification

    Due : 25 Jan, 2023 (15 months ago)
    Posted : 16 months ago
    Started : 16 Dec, 2022 (16 months ago)

    Replacement of existing sinks and countertops at 2 classrooms of the 2nd floor in building D. Minor renovations in the black box theater. Renocations and upgrades of the Laundry Room in Building H and the Boys Locker room restroom to be code compliant. Addition of a closet in Building G corridor and minor MEP upgrades to laundry room in Building G. Card reader installation and minor repairs to exterior doors throughout the campus.

    From: San Antonio Independent School District (School)

  • CONSTRUCTION: ARB Restroom Renovation at the Mike Monroney Aeronautical Center, Oklahoma City, OK

    Type : Bid Notification

    Due : 19 May, 2020 (about 3 years ago)
    Posted : about 4 years ago
    Started : 15 May, 2020 (about 4 years ago)

    All work shall be accomplished in accordance to the project specifications and drawings.This project is for the ARB Restroom Renovation which will include:Base Bid - Construction for the renovation of the restrooms on all four (4) floors of the ARB building to bring the restrooms to ADA code compliance including new fixtures and finishes.Option 1 - Wall Paneling - Provide and install new wall paneling at designated corridor walls.Option 2 - Wall Paneling

    From: Federal Government (Federal)

  • Z2AA--CON | 598-19-127 | B104 Renovations - LETC

    Type : Bid Notification

    Due : 01 Apr, 2024 (24 days ago)
    Posted : 1 month ago
    Started : 22 Mar, 2024 (1 month ago)

    Abbreviated Scope of Work: 1.0 Scope of Work 1.1 The project Building 104 Renovations is located at the Eugene J. Towbin Healthcare Center, North Little Rock, AR, Building 104. 1.2 The Law Enforcement Training Center (LETC) provides training to VA and DOD law enforcement/ security personnel to enhance the safety of veterans, guests, and employees.

    From: Federal Government (Federal)