Search results for: bypass pipe repair

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 55
  • Nolin Bypass Pipe Repair

    Type : Bid Notification

    Due : 23 Nov, 2022 (17 months ago)
    Posted : 17 months ago
    Started : 10 Nov, 2022 (17 months ago)

    Nolin Lake Bypass Upper Elbow RepairThis estimated construction cost is between $50,000 and $150,000.Site Visits is mandatory and scheduled for 16 November 2022 at 0900 ET.

    From: Federal Government (Federal)

  • 2024 Sewer CIPP Rehabilitation Project, Contract No. I400139 - WA-2024-307

    Type : Bid Notification

    Due : 25 Apr, 2024 (in 7 days)
    Posted : 12 days ago
    Started : 04 Apr, 2024 (13 days ago)

    The scope of work shall be completed primarily by utilizing pipe rehabilitation using Cured-In-Place Pipe (CIPP) methods. The work also shall include rehabilitation of concrete structures, removal and repair of pipes, installation of new manholes, bypass pumping, traffic control, and public relations activities to facilitate pipeline rehabilitation and other miscellaneous incidental work necessary to complete the project as specified.

    From: Reno (City)

  • Bids for the removal of the temporary bypass pump forcemain piping

    Type : Bid Notification

    Due : 29 Apr, 2024 (in 11 days)
    Posted : 17 days ago
    Started : 16 Mar, 2024 (1 month ago)

    The City is seeking Bids for the removal of the temporary bypass pump forcemain piping and all associated fittings. The work shall include but is not limited to removal of the bypass piping in its entirety, full restoration of all driveway crossings and trenches in accordance with Exhibit H - Drawing D1 – Temp Bypass FM Pavement Restoration Details, restoration of fencing at the North Wastewater Treatment Plant and landscape restoration.

    From: Burlington (City)

  • Sanitary and Storm Sewer Rehabilitation Annual Contract

    Type : Bid Notification

    Due : 28 Jul, 2022 (20 months ago)
    Posted : 21 months ago
    Started : 30 Jun, 2022 (21 months ago)

    The Project includes, but may not be limited to, the following Work: Cleaning and video inspection of existing sanitary and storm sewer pipes; bypass pumping; sanitary and storm sewer pipe point repairs; replacement of sanitary sewer manholes; replacement of storm sewer inlets and manholes; repair and replacement of sanitary sewer laterals; restoration of reinforced concrete sidewalks, driveways, and curb and gutter; restoration of asphalt streets

    From: City of Meridian (City)

  • Annual Contract for Sanitary Sewer Repairs

    Type : Bid Notification

    Due : 16 Sep, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 10 Aug, 2020 (about 3 years ago)

    The scope for this project will include but not be limited to construction of cured-in-place pipe, pipe bursting, internal point repairs, jack and bore installations, external point repairs and pipe replacement, aerial creek crossings, bypass pumping, CCTV inspection, pavement restoration, curb and sidewalk repair, and landscape restoration.

    From: Georgia (State)

  • Town of Madisonville - Pine Street Water Storage Tank Rehabilitation

    Type : Bid Notification

    Due : 16 Nov, 2022 (17 months ago)
    Posted : 17 months ago
    Started : 01 Nov, 2022 (17 months ago)

    - Perform Surface Preparation and Install Epoxy Coating on Interior (ceiling only) and Exterior Above Ground Surfaces of Concrete Water Storage Tank (Including Roof) - Complete and In-Place - Remove and Replace All Piping Inside Storage Tank to 2-feet Outside the Tank Including Sealing all Wall Penetrations - Install Tank Bypass Piping and Valves (Including all tie-ins and pipe coating) - Miscellaneous Repairs (Including Access Manhole & Overflow

    From: Professional Engineering Consultants (Utilities)

  • 2021 CMOM Package 2A (CIPP) Project

    Type : Bid Notification

    Due : 09 Feb, 2024 (2 months ago)
    Posted : 3 months ago
    Started : 25 Jan, 2024 (2 months ago)

    CO-00684 Sealed bids are requested by the San Antonio Water System for the construction of approximately 4,062 LF of 8- to 30-inch existing sanitary sewer main to be rehabilitated via cured-in-place-pipe (CIPP), bypass pumping, miscellaneous point repairs, and associated manhole improvements for the 2021 CMOM Package 2A (CIPP) Project, SAWS Job No. 23-4513.

    From: San Antonio Water System (Utilities)