Type : Bid Notification
Nolin Lake Bypass Upper Elbow RepairThis estimated construction cost is between $50,000 and $150,000.Site Visits is mandatory and scheduled for 16 November 2022 at 0900 ET.
Nolin Lake Bypass Upper Elbow RepairThis estimated construction cost is between $50,000 and $150,000.Site Visits is mandatory and scheduled for 16 November 2022 at 0900 ET.
Contractor will be responsible for system cleaning, CCTV inspection, excavation, bypass pumping (if necessary), pipe cleaning, repair and/or replacement, catch basin cleaning, repair and/or replacement, backfill, traffic control (if necessary), and site restoration. Site restoration shall include, but may not be limited to, grading, grassing, asphalt road/drive repair, gravel/concrete drive repair, sidewalk and/or curb & gutter.
The scope of work shall be completed primarily by utilizing pipe rehabilitation using Cured-In-Place Pipe (CIPP) methods. The work also shall include rehabilitation of concrete structures, removal and repair of pipes, installation of new manholes, bypass pumping, traffic control, and public relations activities to facilitate pipeline rehabilitation and other miscellaneous incidental work necessary to complete the project as specified.
The scope for this project will include but not be limited to construction of cured-in-place pipe, pipe bursting, internal point repairs, jack and bore installations, external point repairs and pipe replacement, aerial creek crossings, bypass pumping, CCTV inspection, pavement restoration, curb and sidewalk repair, and landscape restoration.
Current User: Home Biznet Menu Log In/Out Search Search Results Results Detail SCP Solicitation Details State Contracting Portal Solicitation Details Organization Administrative Services, Procurement Services Project/Solicitation # 18PSX0285 Solicitation Type Request for Proposal Due Date 03/13/2019 Set-Aside YES Qualified Partnership NO Summary Complete In Place Trenchless Pipe Lining Submit On-Line Request for Proposal Addenda RFP Addendum 2, Dated
Complete In Place Trenchless Pipe Lining Contract Number: 18PSX0285 Award Date: 05/30/2019 Contact: Arlene Watson-Paulin Telephone: (860) 713-5237 E-Mail: arlene.watson-paulin@ct.gov For More Details(Doc.): https://biznet.ct.gov/..
CO-00684 Sealed bids are requested by the San Antonio Water System for the construction of approximately 4,062 LF of 8- to 30-inch existing sanitary sewer main to be rehabilitated via cured-in-place-pipe (CIPP), bypass pumping, miscellaneous point repairs, and associated manhole improvements for the 2021 CMOM Package 2A (CIPP) Project, SAWS Job No. 23-4513.