Search results for: cabling

Showing opportunity 1 - 10 of 154
  • On Call Horizontal Cabling and Installation

    Type : Bid Notification

    Due : 29 Apr, 2024 (in 3 days)
    Posted : 26 days ago
    Started : 29 Mar, 2024 (27 days ago)

    (Includes Clustering Software) 20928 - Communications: Networking, Linking, Etc. 28024 - Building Cables And Wires, Single And Multiconductor: Types Nm, Thwn, Tw, Thw, Thhn, Xhhw, Rhw, Rr, Romex, Etc. 28070 - Telephone Cables And Wires, Single And Multiconductor, Clad Steel And Copper 72523 - Fiber Optics Cables, Interconnecting Components, And Accessories (Including Wiring Systems Tools And Supplies) (Effective 3-1-07 This Class-Item Inactivated

    From: Garden Grove (City)

  • Mission Control <b>Cabling</b> Reconfiguration - Segment 5

    Mission Control Cabling Reconfiguration - Segment 5

    Type : Bid Notification

    Due : 25 Apr, 2024 (Today)
    Posted : 11 days ago
    Started : 11 Apr, 2024 (13 days ago)

    Project: Mission Control Cabling Reconfiguration - Segment 5 Ref. #: 24-05478 Type: RFB Status: Open Open Date: Apr 11th 2024, 10:00 AM PDT Questions Due Date: Never Close Date: Apr 25th 2024, 2:00 PM PDT Days Left: 4 Project Description:This is a request for an informal bid to support the removal/reconfiguration of structured cabling: • REMOVE 4 - SHARED STATIONS • ADD 2 - STAFF STATIONS • ADD 2 - MANAGER STATIONSS • RELOCATE 2 - PRINTER AREAS, AS

    From: Inland Empire Health Plan (Other)

  • Campus Structured Cabling Upgrade

    Type : Bid Notification

    Due : 02 May, 2024 (in 7 days)
    Posted : 15 days ago
    Started : 25 Mar, 2024 (1 month ago)

    Reference:AU2024-002 Campus Structured Cabling Upgrade NEW OR UPDATED April 08, 2024 02 May 2024 (Closing date appears to be Thursday, May 02, 2024 - potential bidders should confirm) This opportunity is in the Atlantic Region (includes the provinces of New Brunswick, Newfoundland, Nova Scotia, Prince Edward Island) A full access subscription is required to use the enhanced features of bidsCanada which includes getting the direct link to this RFP,

    From: Government of Quebec (State)

  • Network Cabling and IDF Build-Out Services

    Type : Bid Notification

    Due : 02 May, 2024 (in 7 days)
    Posted : 12 days ago
    Started : 12 Apr, 2024 (13 days ago)

    Vendors performing cabling services must have the ability to adhere to the City’s Structured Communications Cabling System (SCCS) and IDF build out standards and specifications listed in City of Santa Monica Communications (SCCS) and IDF Build out Standards.TimelineRelease Project Date:April 12, 2024Question Submission Deadline:April 18, 2024, 3:00pmQuestion Response Deadline:April 25, 2024, 5:00pmBid Submission Deadline:May 2, 2024, 3:00pm

    From: Santa Monica (City)

  • Data Cabling Equipment and Services

    Type : Bid Notification

    Due : 01 May, 2024 (in 5 days)
    Posted : 11 days ago
    Started : 30 Mar, 2024 (26 days ago)

    Use plenum Velcro cable ties for cable management. 77. Copper cabling must be tested and certified after installation as required for cable manufacturer’s warranty.

    From: Greenville County Schools (School)

  • Network Cabling Installation Services

    Type : Bid Notification

    Due : 10 May, 2024 (in 15 days)
    Posted : 12 days ago
    Started : 12 Apr, 2024 (13 days ago)

    NO PUBLIC OPENING The University of Wisconsin-La Crosse Campus, hereinafter referred to as the “University”, through its Purchasing Services Department, hereinafter referred to as “Purchasing”, on behalf of ITS and Facilities Departments, hereinafter referred to as “Department”, requests bids for the purchase of Network Cabling Services See the Terms and Requirements document in the BUYER ATTACHMENTS tab for specific bid information.

    From: Wisconsin (State)

  • Tel/Data Cabling Services

    Type : Bid Notification

    Due : 30 Apr, 2024 (in 5 days)
    Posted : 19 days ago
    Started : 22 Mar, 2024 (1 month ago)

    of wire mold, raceways, trays, wiring conduits • Proper termination of wiring at wall plates, surface mount boxes, SFPs and patch panels • Thorough end to end testing and report of individual runs. • Providing wire management to organize wiring and minimize safety hazards. • Proper labeling source and destination of individual runs with labeling tape • Providing reasonable slack on request at each run to support future modifications. 3.0 TIMELINE

    From: Santa Clara County Superior Court (County)