Type : Bid Notification
For the Additive Manufacturing Lab remodel, interior improvements include adding a new hallway within laboratory storage 156 that leads into the student commons, (2) two sets of double doors, (1) one single door (within a 1-hour rated wall), and (1) one single door into storage 161as well as a new continuous fume hood system (under separate permit) within the additive manufacturing lab 151.