Search results for: canal road pump station

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 41
  • Canal Road Pump Station No. 1 & Relief Wells - Wood River Levee District

    Type : Bid Notification

    Due : 18 Aug, 2021 (about 2 years ago)
    Posted : about 3 years ago
    Started : 16 Aug, 2021 (about 2 years ago)

    The Site Visit is scheduled on THURSDAY, 29 July 2021 at 9:00am CST.This solicitation is for Wood River Levee District to construct a pump station; adjoining dewatering manhole and precast concrete box culvert intake tunnel; ductile iron discharge pipes and outfall structure; access roads; parking area; reinforced concrete pipes (RCP) and precast manholes/drainage structures; concrete-paved ditch; modification of an existing gravity drain and construction

    From: Federal Government (Federal)

  • Canal Road Pump Stations No. 2 & No. 3 at Wood River Levee District

    Type : Award

    Due : 13 Oct, 2022 (18 months ago)
    Posted : 19 months ago
    Started : 28 Sep, 2022 (19 months ago)

    CANAL ROAD PUMP STATIONS NUMBER 2 AND 3 AT WOOD RIVER LEVEE DISTRICT "REACH 5"The work includes installation of two (2) pump stations and two (2) relief wells. The two (2) relief wells are D-type, 10-inch diameter and approximately 65 feet deep. Relief Well construction will include riser pipe, well screen, filter pack, well development and well testing.

    From: Federal Government (Federal)

  • CERP, IRL-S, C-23/C-24 North Reservoir, S-426, Contract 4A Project, St. Lucie County, Florida.

    Type : Pre-Bid Notification

    Due : 08 May, 2024 (in 4 days)
    Posted : 9 days ago
    Started : 23 Apr, 2024 (10 days ago)

    The scope of work includes an access road, earthwork, pump station, drainage canal, and culverts in St. Lucie County adjacent to the C-24 Canal, within the northwestern portion of the C-24 drainage basin. The project area is approximately 90 acres. The fully constructed C-23/C-24 North Reservoir is designed to hold 32,612 ac-ft of water at Normal Full Storage Level when fully constructed.

    From: Federal Government (Federal)

  • 55-24 2024 Green Road Pump Station

    Type : Bid Notification

    Due : 13 Jun, 2024 (in 1 month)
    Posted : 6 days ago
    Started : 12 Apr, 2024 (21 days ago)

    55-24 2024 Green Road Pump Station File Number:55-24 Ordinance:9-2021 Description:FOR THE DIVISION OF WATER FOR THE DEPARTMENT OF PUBLIC UTILITIES, AS AUTHORIZED BY ORDINANCE 9-2021. PASSED JANUARY 20, 2021. There is no charge for plans and specifications. Bidders must be on the Plan-holders list to submit a bid or receive any addenda.

    From: Cleveland (City)

  • Indian River Lagoon South (IRL-S) C-23/C-24 North Reservoir S-425/S-426 Contract 4A

    Type : Bid Notification

    Due : 06 Nov, 2023 (5 months ago)
    Posted : 6 months ago
    Started : 27 Oct, 2023 (6 months ago)

    The work involves a portion of the C-23/C-24 North Reservoir including an access road, earthen embankment, pump station, drainage canal, and culverts in St. Lucie County adjacent to the C-24 Canal, within the northwestern portion of the C-24 drainage basin.

    From: Federal Government (Federal)

  • PLA Special Notice for CERP IRL C-23, C-24 4A

    Type : Bid Notification

    Due : 05 Feb, 2024 (2 months ago)
    Posted : 3 months ago
    Started : 29 Jan, 2024 (3 months ago)

    Army Corps of Engineers has a new requirement for an access road, earthwork, pump station, drainage canal, and culverts in St. Lucie County adjacent to the C-24 Canal, within the northwestern portion of the C-24 drainage basin. The Comprehensive Everglades Restoration Plan (CERP) was authorized by Congress in 2000. The main objective of the plan is hydrologic restoration.

    From: Federal Government (Federal)

  • Southwest Pump Station and Storage Facility

    Type : Bid Notification

    Due : 21 Jul, 2023 (9 months ago)
    Posted : 11 months ago
    Started : 06 Jul, 2023 (10 months ago)

    The existing booster station will remain in service and be protected during the construction of the permanent pump station. Pre-Bid Details Date: 6/14/2023 Time: 9:00 AM Location: 802 N. Kealy St., Lewisville, TX 75057 Notes: Non-Mandatory pre-bid meeting.

    From: HDR Engineering Inc (Co-op)