Search results for: canaveral harbor

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 20
  • Canaveral Harbor Sand Bypass System Phase VI, Brevard County, Florida

    Type : Bid Notification

    Due : 26 Apr, 2024 (Yesterday)
    Posted : 14 days ago
    Started : 12 Apr, 2024 (15 days ago)

    If pipeline is to be run across the Canaveral Harbor Entrance Channel, it must be trenched below the required depth of -46 ft MLLW so as to not interfere with navigation. In 2019, a five-foot pipeline trench was constructed at Station 141+00 to -51 feet MLLW to traverse the pipeline under the Canaveral Harbor channel.

    From: Federal Government (Federal)

  • Canaveral Harbor Sand Bypass System Phase VI, Brevard County, Florida

    Type : Bid Notification

    Due : 27 Nov, 2023 (5 months ago)
    Posted : 6 months ago
    Started : 27 Oct, 2023 (6 months ago)

    In 2019, a five-foot pipeline trench was constructed at Station 141+00 to -51 feet MLLW to traverse the pipeline under the Canaveral Harbor channel. If additional material must be dredged to place pipeline in the trench, it may be side-casted within the Canaveral Harbor channel below the required depth or transported offshore to the Canaveral Ocean Dredged Material Disposal Site (ODMDS).

    From: Federal Government (Federal)

  • Canaveral Harbor Maintenance Dredging, 41 to 46-Foot Project, Brevard County, Florida

    Type : Bid Notification

    Due : 12 Dec, 2022 (16 months ago)
    Posted : 16 months ago
    Started : 06 Dec, 2022 (16 months ago)

    SOURCES SOUGHT SYNOPSISW912EP23Z0007SUBJECT: Canaveral Harbor Maintenance Dredging, 41 to 46-Foot Project, Brevard County, FloridaSOLICITATION NUMBER: GROUP1-18-R-J026RESPONSE DATE: December 12, 2022CONTRACT SPECIALIST NAME, PHONE NUMBER & EMAIL: Ruth C.

    From: Federal Government (Federal)

  • Canaveral Harbor Maintenance Dredging, 41 to 46-Foot Project, Brevard County, Florida

    Type : Award

    Due : 30 Jun, 2023 (10 months ago)
    Posted : 13 months ago
    Started : 30 Mar, 2023 (13 months ago)

    Option B includes dredging shoal material from the Canaveral Harbor T.A.C. STA. 4+84.42 to T.T.B. STA. 15+00 at the 41-foot plus 1-foot allowable overdepth. Option C includes dredging shoal material from the Canaveral Harbor CUT-2 STA. 182+00 to CUT-3 Sta. 215.00 at the 44-foot plus 1-foot allowable overdepth.

    From: Federal Government (Federal)

  • Canaveral Harbor Sand Bypass System Phase V Brevard County, Florida

    Type : Award

    Due : 11 Sep, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 26 Sep, 2018 (about 5 years ago)

    DESCRIPTION OF WORK: The project consists of base and option work for dredging beach compatible sand from the Sand Bypass Dredging Area (SBDA) north of the Canaveral Harbor Inlet and transporting the dredged material to a designated beach placement site south of the inlet. The sand material will be transferred under the Canaveral Harbor navigation channel via a pipeline excavation trench.

    From: Federal Government (Federal)

  • CANAVERAL HARBOR MAINTENANCE DREDGING, 41, 42 AND 43-FOOT PROJECT, BREVARD COUNTY, FLORIDA

    Type : Award

    Due : 05 Oct, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 20 Sep, 2021 (about 2 years ago)

    Canaveral Harbor Maintenance Dredging, 41, 42 And 43-Foot Project, Brevard County, FloridaCanaveral Harbor maintenance dredging will require removal of shoal material from identified dredging areas. Project work will be split between base and four options. A portion of the dredge material will be evaluated for disposal into the Nearshore Disposal Area.

    From: Federal Government (Federal)

  • Port Canaveral Harbor Tug Services Option Period 1

    Type : Bid Notification

    Due : 14 Sep, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 10 Sep, 2020 (about 3 years ago)

    See Market Survey attached.

    From: Federal Government (Federal)