Type : Bid Notification
If pipeline is to be run across the Canaveral Harbor Entrance Channel, it must be trenched below the required depth of -46 ft MLLW so as to not interfere with navigation. In 2019, a five-foot pipeline trench was constructed at Station 141+00 to -51 feet MLLW to traverse the pipeline under the Canaveral Harbor channel.