Search results for: canyon ferry powerplant

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 37
  • CANYON FERRY POWERPLANT GENERATOR REWIND REFURBISHMENT - IDIQ

    Type : Contract

    Due : 31 Dec, 2026 (in about 2 years)
    Posted : about 2 years ago
    Started : 27 Jul, 2021 (about 2 years ago)

    CANYON FERRY POWERPLANT GENERATOR REWIND REFURBISHMENT - IDIQ Solicitation ID/Procurement Identifier: 140R6021R0012 Ultimate Completion Date: Thu Dec 31 18:00:00 GMT 2026

    From: Federal Procurement Data System (Federal)

  • 28--TURBINE RUNNER REPLACEMENT CANYON FERRY POWERPLANT

    Type : Pre-Bid Notification

    Due : 11 Apr, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 09 Jan, 2020 (about 4 years ago)

    Some components will be delivered to the Canyon Ferry Powerplant located near Helena, Montana in Lewis and Clark County; other components will be delivered to a location to be determined in Alabama.

    From: Federal Government (Federal)

  • 43--AIR COMPRESSORS CANYON FERRY POWERPLANT

    Type : Pre-Bid Notification

    Due : 01 Jun, 2020 (about 3 years ago)
    Posted : about 4 years ago
    Started : 19 May, 2020 (about 4 years ago)

    The Bureau of Reclamation, Missouri Basin Region, anticipates awarding a Purchase Order for two Station Service Air Compressors; flooded oil rotary screw type, with 50 HP nominal, 460 Volt, 60 Hz, 3 phase EISA motor, minimum rated capacity of 225 acfm @ 125 psig, continuous duty rated for 24/7/365 operation; includes travel to installation site for equipment startup with operations and maintenance training. The North American Industry Classification System (NAICS) is 333912. The small business standard is 1,000 employees. This procurement is being advertised as a 100% Small Business Set Aside. The Solicitation 140R6020Q0050 is tentatively scheduled to be available on or about June 1, 2020 at

    From: Federal Government (Federal)

  • Z--MT-CANYON FERRY POWERPLANT BRIDGE CRANE

    Type : Pre-Bid Notification

    Due : 16 Sep, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 02 Aug, 2019 (about 4 years ago)

    Work is located at Canyon Ferry Powerplant approximately 17 miles east of Helena, Montana, in Lewis and Clark County.

    From: Federal Government (Federal)

  • Canyon Ferry Powerplant, 115kV Switchyard Equipmen

    Type : Bid Notification

    Due : 21 May, 2021 (about 2 years ago)
    Posted : about 3 years ago
    Started : 12 Apr, 2021 (about 3 years ago)

    Canyon Ferry Powerplant, 115kV Switchyard Equipment Replacement

    From: Federal Government (Federal)

  • Y--MT - CF LOW VOLTAGE DISTRIBUTION SYSTEM

    Type : Bid Notification

    Due : 09 Aug, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 31 Jul, 2019 (about 4 years ago)

    Description: CANYON FERRY POWERPLANT AND DAMLOW-VOLTAGE ELECTRICAL DISTRIBUTION SYSTEM REPLACEMENT,HELENA-GREAT FALLS DIVISISON, CANYON FERRY UNIT, PICK-SLOANMISSOURI BASIN PROJECTHELENA, MONTANAWork is located at Canyon Ferry Powerplant approximately 17 miles east of Helena, Montana, in Lewis andClark County.The project replaces low-voltage alternating current (AC) and direct current (DC) circuitbreakers, automatic and manual transfer switches, safety

    From: Federal Government (Federal)

  • CANYON FERRY POWERPLANT ROOF REPLACEMENT

    Type : Bid Notification

    Due : N/A
    Posted : about 4 years ago
    Started : 11 Jun, 2019 (about 4 years ago)

    Main Powerplant Roof: Supply only, new aluminum pipe railing; Remove and dispose of existing joint material and sealant in all existing roof joints and cracks; and, Prepare concrete joints and cracks and install new joint packing and sealant.

    From: Federal Government (Federal)