Search results for: cast iron water

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 414
  • CAST IRON WATER LINE REPLACEMENT PROJECT – FORD CITY BOROUGH

    Type : Bid Notification

    Due : 28 Apr, 2024 (Yesterday)
    Posted : 17 days ago
    Started : 13 Apr, 2024 (15 days ago)

    ADVERTISEMENT FOR BIDS The Borough of Ford City will receive sealed bids until 10:00 a.m. prevailing local time on Tuesday May 21, 2024, at the Ford City Borough Municipal Building, 1000 Fourth Avenue, Ford City, PA 16226 for: Contract 2023-1 Cast Iron Water Line Replacement Project The Project consists of the replacement of approximately 45,000 lineal feet of 6”, 8” and 12” water line, service lines (including lead service lines), hydrants and all

    From: Stiffler McGraw (Co-op)

  • Cast Iron Water Transmission Main Replacement - WS85508004-2

    Type : Bid Notification

    Due : 27 Oct, 2023 (6 months ago)
    Posted : 6 months ago
    Started : 28 Sep, 2023 (7 months ago)

    Additional Information The City of Phoenix is seeking a qualified consultant to provide engineering services for replacement of a 20-inch cast iron water transmission main and a 14-inch cast iron water transmission main.

    From: Phenoix (City)

  • Construction of the 12-INCH CAST IRON WATER MAIN SPRAY-IN-PLACE PIPELINE PROJECT located in Catoosa County, Georgia

    Type : Bid Notification

    Due : 28 Feb, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 13 Feb, 2019 (about 5 years ago)

    The approximate extent and character of the work is generally described as follows: The 12-inch cast iron water main spray-in-place pipeline project in Ringgold, Georgia includes the closed circuit television inspection and diagnosis of 835 LF of 12” cast iron water main, the cleaning of 835 LF of 12” cast iron water main and the spray-in-place pipeline application of epoxy lining in 835 LF of 12” cast iron water main.

    From: Ringgold (City)

  • CAST IRON WATER METER BOXES & LIDS AND WATER VALVE BOXES & COVERS

    Type : Bid Notification

    Due : 06 Apr, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 15 Mar, 2022 (about 2 years ago)

    CITY OF TUCSONNOTICE OF INVITATION FOR BID NO 226014TITLE: CAST IRON WATER METER BOXES & LIDS AND WATER VALVE BOXES & COVERS SUBMITTAL DUE DATE: Wednesday, April 6, 2022 AT 2:00 P.M. LOCAL AZ TIMEPRE-SUBMITTAL CONFERENCE DATE: Wednesday, March 23, 2022 TIME: 10:00 am LOCAL AZ TIME LOCATION:

    From: Tucson (City)

  • Rehabilitation of Cast Iron Water Main Pipes

    Type : Bid Notification

    Due : 18 Nov, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 07 Oct, 2020 (about 3 years ago)

    The City of Bowie, Maryland requests proposals from Contractors for the rehabilitation of cast iron pipe (CIP) water mains using Class IV structural cured-in-place pipe (CIPP) lining in the Heather Hills subdivision of the City.   Specifications and bid documents are available at no cost by emailing your request to Jackie Tayman ( jtayman@cityofbowie.org ).            

    From: Bowie (City)

  • Morrill Drive and Phase II Campus-Wide Domestic Water Line Replacement

    Type : Bid Notification

    Due : 20 May, 2024 (in 21 days)
    Posted : 9 days ago
    Started : 19 Apr, 2024 (9 days ago)

    ="no-follow" href="mailto:david_hammock@ncsu.edu">david_hammock@ncsu.edu Closing Date 05/20/2024 Project Budget $3,017,614 Project Description One-Two Sentences This phased project replaces approximately 1800 feet of 1960s vintage 8" cast iron water main with 12" ductile iron, and includes replacing hydrants.

    From: University of North Carolina (Higher Education)

  • Morrill Drive and Phase II Campus-Wide Domestic Water Line Replacement

    Type : Bid Notification

    Due : 20 May, 2024 (in 21 days)
    Posted : 9 days ago
    Started : 04 Apr, 2024 (24 days ago)

    ="no-follow" href="mailto:david_hammock@ncsu.edu">david_hammock@ncsu.edu Closing Date 05/20/2024 Project Budget $3,017,614 Project Description One-Two Sentences This phased project replaces approximately 1800 feet of 1960s vintage 8" cast iron water main with 12" ductile iron, and includes replacing hydrants.

    From: North Carolina University (Higher Education)