Search results for: cell site

Showing opportunity 1 - 10 of 14
  • CELL-SITE SIMULATOR SYSTEM with VEHICLE - REBID

    Type : Bid Notification

    Due : 08 May, 2024 (in 9 days)
    Posted : 3 days ago
    Started : 18 Apr, 2024 (10 days ago)

    Identity (IMEI) cellular handset identification and location system also identified as a Cell-Site Simulator (CSS) System and installation of the CSS System into a Bidder-provided vehicle for use in law enforcement operations.

    From: Albuquerque (City)

  • NAVAIDS BATTERIES. LITTLE ROCK, AR (LIT) VOR, INSTALL (18) GNB 90G07, VENT PLUG TOOL, <b>CELL</b> PULLER, VIRTUAL <b>SITE</b> SURVEY, SEISMIC REPORT, NO ASBESTOS.

    NAVAIDS BATTERIES. LITTLE ROCK, AR (LIT) VOR, INSTALL (18) GNB 90G07, VENT PLUG TOOL, CELL PULLER, VIRTUAL SITE SURVEY, SEISMIC REPORT, NO ASBESTO...

    Type : Contract

    Due : 11 Dec, 2024 (in 7 months)
    Posted : 15 days ago
    Started : 12 Apr, 2024 (16 days ago)

    LITTLE ROCK, AR (LIT) VOR, INSTALL (18) GNB 90G07, VENT PLUG TOOL, CELL PULLER, VIRTUAL SITE SURVEY, SEISMIC REPORT, NO ASBESTOS. Solicitation ID/Procurement Identifier: 1148 Ultimate Completion Date: Wed Dec 11 18:00:00 GMT 2024

    From: Federal Procurement Data System (Federal)

  • GAOA - El Cap Recreation Area Improvements: Campground and Day Use Area

    Type : Bid Notification

    Due : 29 May, 2024 (in 29 days)
    Posted : 23 days ago
    Started : 25 Apr, 2024 (3 days ago)

    The site is in a remote location without utilities or potable water.Communication and cell phone service is not available on site or in the immediate vicinity.MAGNITUDE OF CONSTRUCTION PROJECTDisclosure of the Magnitude of Construction is between: $1,000,000 and $5,000,000.Period of Performance is: June 15, 2024 to June 30, 2025

    From: Federal Government (Federal)

  • Proposal: Cell Two Grubbing and Grinding - Foothills Boulevard Regional Landfill

    Type : Bid Notification

    Due : 09 May, 2024 (in 10 days)
    Posted : 10 days ago
    Started : 03 Apr, 2024 (25 days ago)

    Fraser-Fort George is requesting Proposals from qualified professionals to provide grubbing and grinding services at the Foothills Boulevard Regional Landfill site. This includes the mechanical removal, sorting, piling, grinding and marketing of stumps, organic overburden, and vegetative cover in support of Cell Two development at the Foothills Site.

    From: Fraser-Fort George (Other)

  • 2023-2024 Traffic Control Reg_Form

    Type : Bid Notification

    Due : 02 Dec, 2024 (in 7 months)
    Posted : 14 months ago
    Started : 01 Feb, 2023 (15 months ago)

    .  Cell phone usage is to be limited to job related or emergency calls only and when safe to do so.

    From: Vernon (City)

  • Pre-Qualification - Traffic Control Services

    Type : Bid Notification

    Due : 02 Dec, 2024 (in 7 months)
    Posted : 15 months ago
    Started : 27 Dec, 2022 (16 months ago)

    .  Cell phone usage is to be limited to job related or emergency calls only and when safe to do so.

    From: Vernon (City)

  • Steel Platform Truck Scale

    Type : Bid Notification

    Due : 24 Apr, 2024 (4 days ago)
    Posted : 1 month ago
    Started : 14 Mar, 2024 (1 month ago)

    \n\nLoad cells shall have a minimum 5-year warranty against defects in materials and\nworkmanship and failure resulting from lightning or surge voltages. The warranty shall cover\nall costs associated with replacement cell, travel, mileage, and on-site labor.\n\nThe load cells shall be B-TEK Model: CPD-M or equivalent.\n"

    From: New Hampshire (State)