Search results for: chamber downstream

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 30
  • 56-Ft Wide Auxiliary Chamber Downstream Closure Retrofit – Coffer Beam for Montgomery Locks and Dam Synopsis

    Type : Pre-Bid Notification

    Due : 31 May, 2022 (23 months ago)
    Posted : about 2 years ago
    Started : 15 Apr, 2022 (about 2 years ago)

    Army Corps of Engineers, Pittsburgh District, has a requirement for a new auxiliary chamber downstream closure system at Montgomery Locks and Dam, Ohio River, Monaca, Bever County, Pennsylvania. The major features of the requirement are identified below:The contract is a fabrication supply contract including furnishing and delivering a complete coffer beam assembly.

    From: Federal Government (Federal)

  • 56-Ft Wide Auxiliary Chamber Downstream Closure Retrofit ? Coffer Beam for Montgomery Locks and Dam

    Type : Bid Notification

    Due : 14 Jul, 2022 (21 months ago)
    Posted : 23 months ago
    Started : 30 Jun, 2022 (22 months ago)

    Cancel the Invitation For Bid (IFB) in accordance w ith FAR Subpart 14.404-1(c)(8). The IFB is being converted to a Request for Proposal (RFP) in accordance w ith FAR 14.404(e)(1).

    From: Federal Government (Federal)

  • Subsurface Utility Investigation – Southside Lowlift Forcemain Replacement

    Type : Bid Notification

    Due : 21 Feb, 2023 (14 months ago)
    Posted : 15 months ago
    Started : 17 Jan, 2023 (15 months ago)

    The design and installation of a sewage flow meter and associated chamber downstream of the LLPS is also included in the project scope. The Regional Municipality of Niagara (“Niagara Region”, “the Region”) retained Associated Engineering (AE) as the Design Consultant to complete the detailed engineering design of the Southside Low Lift Forcemain Replacement.

    From: Niagara Region (County)

  • Hydraulic System Replacement, Pike Island Locks and Dam

    Type : Bid Notification

    Due : 15 Dec, 2022 (16 months ago)
    Posted : 18 months ago
    Started : 15 Dec, 2022 (16 months ago)

    Two (2) HPUs on the river wall; one upstream and one downstream for operation of the Main Chamber culvert valves and miter gates. ?Two (2) HPUs on the middle wall; one upstream and one downstream for operation of Main Chamber culvert valves and miter gates. In addition, the two HPUs on the middle wall are for operation of the Auxiliary Chamber miter gates.

    From: Federal Government (Federal)

  • Pike Island Lock and Dams Hydraulic Repairs

    Type : Bid Notification

    Due : 31 Aug, 2022 (20 months ago)
    Posted : 20 months ago
    Started : 19 Aug, 2022 (20 months ago)

    The new HPUs shall be located in new precast buildings at the following locations:            •           Two (2) HPUs on the river wall; one upstream and one downstream for operation of the Main Chamber culvert valves and miter gates.•           Two (2) HPUs on the middle wall; one upstream and one downstream for operation of Main Chamber culvert valves and miter gates. 

    From: Federal Government (Federal)

  • Nickajack Lock Armor Painting

    Type : Pre-Bid Notification

    Due : 17 Jul, 2023 (9 months ago)
    Posted : 9 months ago
    Started : 03 Jul, 2023 (10 months ago)

    The scope has been broken up into 3 sections; Upstream Approach Walls, Lock Chamber Walls & Downstream Approach Wall. The base captures the Upstream Approach and Downstream Approach walls which are painted yellow. The Lock Chamber Walls are captured as an option and will be painted aluminum. Each wall per section must be painted in full prior to painted the opposing wall or moving to the next section.

    From: Federal Government (Federal)

  • Fort Loudon Lock Wall Armor Painting

    Type : Bid Notification

    Due : 30 Aug, 2022 (20 months ago)
    Posted : 21 months ago
    Started : 24 Aug, 2022 (20 months ago)

    Contractor shall be responsible for painting Upstream Approach Wall Corner Armor (~800 LF), Chamber Corner Armor (~850 LF), Downstream Approach Wall Corner Armor (~775 LF), and Check Posts (53 total). Optionally the Vertical Armor of the Mooring Bit Recesses (Option 1), shall be painted to the summer pool elevation (approx. 100 LF).

    From: Federal Government (Federal)