Type : Contract
DELTA CROSS CHANNEL GATES UPGRADE Solicitation ID/Procurement Identifier: 140R2020Q0006 Ultimate Completion Date: Mon Jul 31 17:00:00 GMT 2023
DELTA CROSS CHANNEL GATES UPGRADE Solicitation ID/Procurement Identifier: 140R2020Q0006 Ultimate Completion Date: Mon Jul 31 17:00:00 GMT 2023
Slide gates that are flush with channel invert shall be removed in their entirety including embedded frames and seals. Contractors shall use saw cuts to the extent possible to limit excavations for removal of embedded gate frame members. The Contractor shall be responsible for coordination of delivery, offloading and proper storage of gates as well as installation.
Delta Cross Channel Gates Upgrade...
Killian Creek WWTP Upgrade Phase 3 Category:Construction Services LINCOLN COUNTY DENVER, NORTH CAROLINA KILLIAN CREEK WWTP UPGRADE PHASE 3 ADVERTISEMENT FOR BIDS Sealed Bids for the construction of the Killian Creek WWTP Upgrade Phase 3 will be received by Lincoln County, C/O John Henry, Purchasing Agent at Lincoln County, 353 N.
screens, demolition of the existing screenings conveyor and replacement with a new screenings conveyor, demolition of four (4) slide gates and replacement with four (4) new slide gates, demolition of the existing grit system including the grit hoppers, piping, and grit pumps, demolition of the existing Flow Equalization Basin Pump Station sump pumps and sump pump piping and replacement of the sump pump system, extension of the concrete headworks channels
The contractor will ensure that all unused cable ports in the governor actuator cabinet will be closed with a threaded metal cap with o-ring.GFE redundant MLDTs will be installed and affixed by the contractor to an aluminum channel mounted on the servo motor #1 using a combination of a U-bolt mount and cantilever bracket.
Jul 20, 2023 2:00:00 PM (local time) Regional Municipality of Waterloo Reference: T2023-169 Prequalification required: No The scope of the Waterloo WWTP Aeration and UV Bypass Upgrades project is to provide secondary treatment treatment process improvements and a new gate to re-direct bypass flows away from the UV system.