Type : Bid Notification
All three (3) project sites consist of various slope stabilization methods using geowebs, a retaining wall, organic soil amendments, slope stabilization matting, and vegetative cover improvements. Approximately 115 linear feet of stream channel realignment with bank stabilization methods will be installed.