Search results for: channel stabilization

Showing opportunity 1 - 10 of 12
  • Cedar Hill Cemetery Slope Stabilization Project

    Type : Bid Notification

    Due : 23 May, 2024 (in 27 days)
    Posted : 1 month ago
    Started : 14 Mar, 2024 (1 month ago)

    All three (3) project sites consist of various slope stabilization methods using geowebs, a retaining wall, organic soil amendments, slope stabilization matting, and vegetative cover improvements. Approximately 115 linear feet of stream channel realignment with bank stabilization methods will be installed.

    From: Suffolk (City)

  • PG6255274 - I-95/I-495 (Capital Beltway) at WSSC Watermain near Everhart Place Drainage Improvement

    Type : Bid Notification

    Due : 25 Apr, 2024 (Yesterday)
    Posted : 3 months ago
    Started : 22 Mar, 2024 (1 month ago)

    The proposed improvements consist of the following: (a) Realignment of the existing stream channel and installation of stabilization measures, including cross vanes; (b) Installation of a reinforced soil slope to stabilize the failed portion of the embankment adjacent to the stream; (c) Existing roadway shoulder repairs, traffic barrier replacement; (d) Erosion and sediment controls; (e) Landscaping.

    From: Maryland (State)

  • Crawford County Lake Margrethe Dam Repairs

    Type : Bid Notification

    Due : 03 May, 2024 (in 7 days)
    Posted : 23 days ago
    Started : 18 Mar, 2024 (1 month ago)

    Description: Project Category Code:Dams/Reservoirs, Erosion Control/Slope, Bank Stabilization, Culverts, Waterways, Stormwater Channels, Construction, Excavation, Erosion Control - Temporary, Concrete Repair Solicitor Details Solicitor Name:OHM AdvisorsDesign Discipline:Soliciting agentAddress:300 East Mitchell Street Suite 2, Petoskey, MI - 49770 Phone:231-344-1161Contact:Jim RintalaEmail:

    From: Orchard Hiltz McCliment Inc (Other)

  • 2024 Chapel Avenue Culvert Replacement

    Type : Bid Notification

    Due : 07 May, 2024 (in 11 days)
    Posted : 13 days ago
    Started : 12 Apr, 2024 (13 days ago)

    The project consists of the following improvements; removal of the existing culvert and replacing with sixty (60) linear feet of double-cell, 7 foot span and 4 foot rise four-sided box culvert, construction of headwalls, installation of buried steel piling cut-off walls (5 feet deep), construction of reno-mattress scour protection within the entrance and exit channel of the culvert, construction of stone-filled gabion basket slope stabilization along

    From: Cherry Hill (Town)

  • 2024 Chapel Avenue Culvert Replacement

    Type : Bid Notification

    Due : 07 May, 2024 (in 11 days)
    Posted : 13 days ago
    Started : 12 Apr, 2024 (13 days ago)

    The project consists of the following improvements; removal of the existing culvert and replacing with sixty (60) linear feet of double-cell, 7 foot span and 4 foot rise four-sided box culvert, construction of headwalls, installation of buried steel piling cut-off walls (5 feet deep), construction of reno-mattress scour protection within the entrance and exit channel of the culvert, construction of stone-filled gabion basket slope stabilization along

    From: Cherry Hill (City)

  • 686 Grand Canyon Drive

    686 Grand Canyon Drive

    Type : Contract

    Due : 11 Jul, 2024 (in 2 months)
    Posted : 28 days ago
    Started : 14 Mar, 2024 (1 month ago)

    Stabilization-201310/04/13719153W1619Monona Terrace Maintenance Projects-201301/09/15718853W1693Booster Station 115 Pipeline Improvements10/04/13718553W1685Well 24 - Roof Repairs09/06/13718253W1183Own Park Drainage Channel Stabilization-201309/06/13718153W1619Monona Terrace Maintenance Projects-201309/06/13718053W1619Monona Terrace Maintenance Projects-201308/23/13717753W1196Reiner Road Resurfacing02/07/14717653W1678Horizontal Sawcutting of Concrete

    From: Madison (City)

  • Old Sauk Trails Business Park - Phase 1

    Old Sauk Trails Business Park - Phase 1

    Type : Contract

    Due : 29 Aug, 2024 (in 4 months)
    Posted : 1 month ago
    Started : 07 Mar, 2024 (1 month ago)

    Stabilization-201310/04/13719153W1619Monona Terrace Maintenance Projects-201301/09/15718853W1693Booster Station 115 Pipeline Improvements10/04/13718553W1685Well 24 - Roof Repairs09/06/13718253W1183Own Park Drainage Channel Stabilization-201309/06/13718153W1619Monona Terrace Maintenance Projects-201309/06/13718053W1619Monona Terrace Maintenance Projects-201308/23/13717753W1196Reiner Road Resurfacing02/07/14717653W1678Horizontal Sawcutting of Concrete

    From: Madison (City)