Charlotte‐Mecklenburg Police Department Northwest Division Station Closed September 12, 2023, 01:00 PM Reference number269‐2024‐007 StatusOpen SummaryBid Due Date: September 12, 2023 at 1 p.m. Type: Invitation to Bid Department: General Services Description The Project is the Charlotte Mecklenburg Police Department’s Northwest Division The building site is located at 1800 Mt Holly‐Huntersville Rd., Charlotte, NC 28214.
This Request for Qualifications (“RFQ”) is issued by the City of Charlotte (“City”) to acquire the services of a Construction Manager-at-Risk (CMAR) for three separate projects which include, the Charlotte-Mecklenburg Police Department (CMP ......Show More
IIIA (HG 2) soft armor D. NIJ Ballistic Level RF 2 (NEW) – This is a new standard under 0101.07 (proposed) by the National Institute of Justice. • Tested against: 7.62x51mm M80 Ball NATO FMJ Steel Jacket Boattail (149 grain), 7.62x39mm (120 grain), 5.56mm M193 Boattail (56 grain) and 5.56mm M855 Boattail (62 grain/steel core tip) rifle rounds • This standard generally meets manufacturer designated “Level III+” or “Level III++” ballistic panels, stab resistant to Level 3 • Hard a
The Project is the Charlotte Mecklenburg Police Department’s Northwest Division The building site is located at 1800 Mt Holly-Huntersville Rd., Charlotte, NC 28214. The Project consists of a new 16,000 square foot, single story facility. Th ......Show More
a=bidlist&prid=4047View Plans: N/A Project consists of approximately 16,000 square feet, new two‐story police station for the University City Division of the Charlotte‐Mecklenburg Police Department (CMPD) and separate parking lots for both visitors and staff. Work consists of Type VB Fully Sprinkled Construction utilizing reinforced concrete walls insulating concrete forms, structural steel, CMU, steel joists and metal deck roof framing.
a=search&prid=4047 Project consists of approximately 16,000 square feet, new two‐story police station for the University City Division of the Charlotte‐Mecklenburg Police Department (CMPD) and separate parking lots for both visitors and staff. Work consists of Type VB Fully Sprinkled Construction utilizing reinforced concrete walls insulating concrete forms, structural steel, CMU, steel joists and metal deck roof framing.