Type : Bid Notification
The project includes the above and below ground chemical piping, chemical pumps, bulk chemical tanks, and in-pipe chemical injection points.
The project includes the above and below ground chemical piping, chemical pumps, bulk chemical tanks, and in-pipe chemical injection points.
Bid Details High Service Pump Station Chemical Piping Replacement Project Active Browse Awarded Bids Download Bid Package Bid Details Agency Name Tampa Bay Water Bid Writer Regina Kavanagh Bid ID ITB-022-0-2023/RK Bid Type ITB - Invitation to Bid Broadcast Date 08/12/2022 10:15 AM Eastern Fiscal Year 2023 Due Date 10/05/2022 2:00 PM Eastern Bid Status Text None Scope of Work The High Service Pump Chemical System treats water from the Surface Water
The High Service Pump Chemical System treats water from the Surface Water Treatment Plant, Brandon Urban Transmission Main, and Desalination Transmission Main. The three sources of water arrive at the pump station and chemical is injected at different locations before and after the pumps. This project will replace the chemical piping (sodium hypochlorite and ammonia hydroxide), the chemical pumps, and the addition of a new injection location.
TASK ORDER FOR ADDITIONAL SERVICES RELATED TO THE HARVEST TANKS CHEMICAL PIPING REPLACEMENT PROJECT AGAINST CONSOLIDATED FACILITIES MANAGEMENT CONTRACT 28321319D00060014 IN CHICAGO, IL. Solicitation ID/Procurement Identifier: 28321319D00060014 Ultimate Completion Date: Sat Mar 23 17:00:00 GMT 2024
Bid Information TypeNotice to Bidders StatusIssued Number18-062 Addendum 1 (A33 Chemical Feed Piping Replacement Theresa Street WRRF) Issue Date & Time3/7/2018 02:13:23 PM (CT) Close Date & Time3/21/2018 12:00:00 PM (CT) Time Left4 hours 27 minutes 27 seconds NotesIf you need assistance in preparing your bid Contact the Purchasing Office at 402-441-8103 for additional assistance.
Existing chemical piping and electrical power are to be disconnected from existing tanks and reconnected to heater and instrumentation of new tank. E-Bidding No
Phase 1 is focusedon the chemical systems for this RFQ. Phase I design portion includes chlorine dioxide system improvements, chemical metering pump replacements, chemical transfer pump replacements, and chemical piping replacement.