Type : Bid Notification
The project includes the above and below ground chemical piping, chemical pumps, bulk chemical tanks, and in-pipe chemical injection points.
The project includes the above and below ground chemical piping, chemical pumps, bulk chemical tanks, and in-pipe chemical injection points.
Bid Details High Service Pump Station Chemical Piping Replacement Project Active Browse Awarded Bids Download Bid Package Bid Details Agency Name Tampa Bay Water Bid Writer Regina Kavanagh Bid ID ITB-022-0-2023/RK Bid Type ITB - Invitation to Bid Broadcast Date 08/12/2022 10:15 AM Eastern Fiscal Year 2023 Due Date 10/05/2022 2:00 PM Eastern Bid Status Text None Scope of Work The High Service Pump Chemical System treats water from the Surface Water
Project: High Service Pump Station Chemical Piping Replacement Project (50049), Contract No. 2023-028 Ref. #: 2023-028 Type: ITB Status: Open Open Date: Apr 13th 2023, 6:00 AM EDT Questions Due Date: May 23rd 2023, 5:00 PM EDT Close Date: Jun 14th 2023, 2:00 PM EDT Days Left: < 1 Project Description:Tampa Bay Water is seeking the solicitation for construction services for its High Service Pump Station facility.
TASK ORDER FOR ADDITIONAL SERVICES RELATED TO THE HARVEST TANKS CHEMICAL PIPING REPLACEMENT PROJECT AGAINST CONSOLIDATED FACILITIES MANAGEMENT CONTRACT 28321319D00060014 IN CHICAGO, IL. Solicitation ID/Procurement Identifier: 28321319D00060014 Ultimate Completion Date: Sat Mar 23 17:00:00 GMT 2024
Bid Information TypeNotice to Bidders StatusIssued Number18-062 Addendum 1 (A33 Chemical Feed Piping Replacement Theresa Street WRRF) Issue Date & Time3/7/2018 02:13:23 PM (CT) Close Date & Time3/21/2018 12:00:00 PM (CT) Time Left4 hours 27 minutes 27 seconds NotesIf you need assistance in preparing your bid Contact the Purchasing Office at 402-441-8103 for additional assistance.
New pipe sizes are all 2-1/2 other than transition fittings for the pump inlet/outlets and the Â3⁄4 piping serving the existing chemical feeder; Replacement of the existing 2 pipe with 2-1/2 piping (approx. 70 lf); Install Â1⁄2 thread-o-lets for the differential pressure taps on the suction and discharge sides of the pumps; Provide 30-240F thermometers for each pump (2 total) Providing and installing (2) new 2 ball valves to separate the existing
Phase I design portion includes chlorine dioxide system improvements, chemical metering pump replacements, chemical transfer pump replacements, and chemical piping replacement.