Search results for: chilled and condenser water

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 386
  • 000187 Hot, Chilled and Condenser Water Pumps

    Type : Bid Notification

    Due : 28 Feb, 2023 (13 months ago)
    Posted : 13 months ago
    Started : 09 Feb, 2023 (13 months ago)

    000187 Hot, Chilled and Condenser Water Pumps Status: Open IFB 9450-3 Hampton Roads Regional Jail -Hampton Roads Regional Jail2690 Elmhurst LanePortsmouth, VA 23701 Closing On: 2/28/23 2:00 PM Time Left: 4 days, 8 hours Provide and install 11 hot water, chilled water and condenser water pumps based on an approved phasing schedule.

    From: Manassas (City)

  • Chilled and Condenser Water Piping Replacement NJDOT Headquarters Ewing, Mercer County, NJ

    Type : Bid Notification

    Due : 08 Sep, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 24 Aug, 2020 (about 3 years ago)

    ADVERTISEMENT FOR BIDS Project No: T0612-00 – Chilled and Condenser Water Piping Replacement Location: NJDOT Headquarters, Ewing, Mercer County, NJ A MANDATORY PRE-BID MEETING IS SCHEDULED FOR 10:00 A.M. AUGUST 24, 2020. LOCATION: CENTRAL STEAM PLANT - NJDOT HEADQUARTERS, 1035 PARKWAY AVENUE, EWING, MERCER COUNTY, NJ. (GPS Coordinates: 40.258165, -74,796346). CONTACT PERSON: RON KRAEMER VIA OFFICE (609) 633-7186 OR VIA CELL (609) 203-2532.

    From: New Jersey Division of Property Management and Construction (State)

  • Chilled and Condenser Water Piping Replacement � NJDOT Headquarters Ewing, Mercer County, NJ

    Type : Bid Notification

    Due : 08 Sep, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 02 Aug, 2020 (about 3 years ago)

    ADVERTISEMENT FOR BIDS Project No: T0612-00 – Chilled and Condenser Water Piping Replacement Location: NJDOT Headquarters, Ewing, Mercer County, NJ A MANDATORY PRE-BID MEETING IS SCHEDULED FOR 10:00 A.M. AUGUST 24, 2020. LOCATION: CENTRAL STEAM PLANT - NJDOT HEADQUARTERS, 1035 PARKWAY AVENUE, EWING, MERCER COUNTY, NJ. (GPS Coordinates: 40.258165, -74,796346). CONTACT PERSON: RON KRAEMER VIA OFFICE (609) 633-7186 OR VIA CELL (609) 203-2532.

    From: New Jersey Division of Property Management and Construction (State)

  • Upgrade Central Chiller Plant and DDC Controls

    Upgrade Central Chiller Plant and DDC Controls

    Type : Bid Notification

    Due : 28 Mar, 2024 (Today)
    Posted : 13 days ago
    Started : 14 Mar, 2024 (13 days ago)

    This project intends to replace the existing Chillers, Upgrade/Refurbish Existing Cooling Towers, Upgrade/Replace the Primary and Secondary Chilled Water Pumps, Condenser Water Pumps, related Piping and Controls, pressure differential Delta P valves in main chilled water lines entering each of the buildings, and interface with existing Johnson Controls Metasys System.The intent of this announcement is to specify brand-name equipment to be included

    From: Federal Government (Federal)

  • Concourse A - Condenser Water Loop

    Type : Bid Notification

    Due : 11 Jun, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 27 May, 2020 (about 3 years ago)

    bidpackageid=98b1ae81-5914-4c9f-b9cb-38b0990e4c45 This will be a turnkey project to build a complete Condenser Water Loop as designed by AME Consulting Engineers. The system will be designed using a shell and tube heat exchanger connected to the Airport’s Central Chiller Plants, chilled water piping, to provide tempered condenser water for the food concessions, water cooled, condensing units on walk-in cooler and freezers and ice machines.

    From: Charlotte (City)

  • Condenser Water Loop - Concourse E

    Type : Bid Notification

    Due : 29 Dec, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 08 Nov, 2021 (about 2 years ago)

    bidpackageid=a7e60a6c-43c8-4b28-a5cd-c5dadb9d9c63 The purpose of this contract is to build a complete Condenser Water Loop as designed by AME Consulting Engineers. The system will be designed using a shell and tube heat exchanger connected to the Airport’s Central Chiller Plant, chilled water piping, to provide tempered condenser water for the food concessions, water-cooled, condensing units on walk-in cooler and freezers.

    From: Charlotte (City)

  • Cooling Tower and Chiller Replacement

    Type : Bid Notification

    Due : 15 Apr, 2024 (in 17 days)
    Posted : 5 days ago
    Started : 22 Mar, 2024 (5 days ago)

    This Request for Qualification is for the design and construction administration service of this project which will involve: • Replacement of two (2) existing water-cooled chillers, cooling tower, existing chilled water primary and condenser pumps with a new air-cooled chiller.

    From: North Carolina Electronic (Other)