Search results for: chilled and condenser water

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 389
  • THE SOUTHWEST FISHERIES SCIENCE CENTER, SANTA CRUZ LABORATORY REQUIRES THREE-PHASE PUMP REPAIRS, AND SEVERAL VFD REPLACEMENTS TO THE BOILER <b>WATER</b> SYSTEM, <b>CONDENSER</b> <b>WATER</b> SYSTEM AND <b>CHILLED</b> <b>WATER</b> SYSTE...

    THE SOUTHWEST FISHERIES SCIENCE CENTER, SANTA CRUZ LABORATORY REQUIRES THREE-PHASE PUMP REPAIRS, AND SEVERAL VFD REPLACEMENTS TO THE BOILER WATER SYSTEM,...

    Type : Contract

    Due : 15 Jul, 2024 (in 2 months)
    Posted : 1 month ago
    Started : 27 Mar, 2024 (1 month ago)

    THE SOUTHWEST FISHERIES SCIENCE CENTER, SANTA CRUZ LABORATORY REQUIRES THREE-PHASE PUMP REPAIRS, AND SEVERAL VFD REPLACEMENTS TO THE BOILER WATER SYSTEM, CONDENSER WATER SYSTEM AND CHILLED WATER SYSTE... Solicitation ID/Procurement Identifier: 1333MF24P0053 Ultimate Completion Date: Mon Jul 15 17:00:00 GMT 2024

    From: Federal Procurement Data System (Federal)

  • Chilled and Condenser Water Piping Replacement NJDOT Headquarters Ewing, Mercer County, NJ

    Type : Bid Notification

    Due : 08 Sep, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 24 Aug, 2020 (about 3 years ago)

    ADVERTISEMENT FOR BIDS Project No: T0612-00 – Chilled and Condenser Water Piping Replacement Location: NJDOT Headquarters, Ewing, Mercer County, NJ A MANDATORY PRE-BID MEETING IS SCHEDULED FOR 10:00 A.M. AUGUST 24, 2020. LOCATION: CENTRAL STEAM PLANT - NJDOT HEADQUARTERS, 1035 PARKWAY AVENUE, EWING, MERCER COUNTY, NJ. (GPS Coordinates: 40.258165, -74,796346). CONTACT PERSON: RON KRAEMER VIA OFFICE (609) 633-7186 OR VIA CELL (609) 203-2532.

    From: New Jersey Division of Property Management and Construction (State)

  • Chilled and Condenser Water Piping Replacement � NJDOT Headquarters Ewing, Mercer County, NJ

    Type : Bid Notification

    Due : 08 Sep, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 02 Aug, 2020 (about 3 years ago)

    ADVERTISEMENT FOR BIDS Project No: T0612-00 – Chilled and Condenser Water Piping Replacement Location: NJDOT Headquarters, Ewing, Mercer County, NJ A MANDATORY PRE-BID MEETING IS SCHEDULED FOR 10:00 A.M. AUGUST 24, 2020. LOCATION: CENTRAL STEAM PLANT - NJDOT HEADQUARTERS, 1035 PARKWAY AVENUE, EWING, MERCER COUNTY, NJ. (GPS Coordinates: 40.258165, -74,796346). CONTACT PERSON: RON KRAEMER VIA OFFICE (609) 633-7186 OR VIA CELL (609) 203-2532.

    From: New Jersey Division of Property Management and Construction (State)

  • Concourse A - Condenser Water Loop

    Type : Bid Notification

    Due : 11 Jun, 2020 (about 3 years ago)
    Posted : about 4 years ago
    Started : 27 May, 2020 (about 3 years ago)

    bidpackageid=98b1ae81-5914-4c9f-b9cb-38b0990e4c45 This will be a turnkey project to build a complete Condenser Water Loop as designed by AME Consulting Engineers. The system will be designed using a shell and tube heat exchanger connected to the Airport’s Central Chiller Plants, chilled water piping, to provide tempered condenser water for the food concessions, water cooled, condensing units on walk-in cooler and freezers and ice machines.

    From: Charlotte (City)

  • Condenser Water Loop - Concourse E

    Type : Bid Notification

    Due : 29 Dec, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 08 Nov, 2021 (about 2 years ago)

    bidpackageid=a7e60a6c-43c8-4b28-a5cd-c5dadb9d9c63 The purpose of this contract is to build a complete Condenser Water Loop as designed by AME Consulting Engineers. The system will be designed using a shell and tube heat exchanger connected to the Airport’s Central Chiller Plant, chilled water piping, to provide tempered condenser water for the food concessions, water-cooled, condensing units on walk-in cooler and freezers.

    From: Charlotte (City)

  • MAINTENANCE OF YORK CHILLERS (230322-002)

    Type : Bid Notification

    Due : 31 Dec, 2025 (in 20 months)
    Posted : 8 days ago
    Started : 04 Apr, 2024 (23 days ago)

    Check operation of chilled water pump, record current draw and operating pressures, check coupler and alignment. Check chilled water pump motor starter operation and condition of contacts. 6. Check operation of condenser water pump, record current draw and operating pressures, check coupler and alignment. Check condenser water pump motor starter operation and condition of contacts. 7.

    From: Erie (County)

  • Condenser Water Loop Repair- Gerena Elementary School

    Type : Bid Notification

    Due : 06 Feb, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 22 Jan, 2020 (about 4 years ago)

    The City is seeking bids from qualified firms to enter into an agreement to make necessary repairs to the main condenser water loop for the chilled water system located at 200 Bernie Ave. in Springfield, MA. The estimated value of the contract is not to exceed $60,000.00. An optional Site Visit has been scheduled for 1/28/20 at 11:00 A.M. at Gerena School, 200 Bernie Avenue, Springfield, MA (

    From: Springfield (City)