Search results for: chilled water control

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 428
  • SUPPORT FOR UNM’S CHILLED WATER CONTROL SYSTEM.

    Type : Bid Notification

    Due : 29 Jul, 2023 (9 months ago)
    Posted : 10 months ago
    Started : 29 Jun, 2023 (10 months ago)

    Procurement Number 30-U6900-23-CP277Agency U6900 - UNIVERSITY OF NEW MEXICOProcurement Type SOLE SOURCEBuyer Procurement Description SUPPORT FOR UNM’S CHILLED WATER CONTROL SYSTEM. Amount $250,000.00Start 06/29/2023End 06/28/2028Due date 07/29/2023Justification PROPRIETARYQuantity of the service 5 YEARSNature of the service SERVICESContractor's Name TRANEAddress 5501 SAN DIEGO RD. NECity ALBUQUERQUECountry UNITED STATESState/Province NMZip 87113

    From: New Mexico General Services Agency (State)

  • Chiller #2 Replacement

    Type : Bid Notification

    Due : 22 May, 2024 (in 24 days)
    Posted : 12 days ago
    Started : 12 Apr, 2024 (15 days ago)

    The selected Contractor will be required to deliver the Work and Services described in the procurement documents including, but is not necessarily limited to, the supply of labour, material, supervision and equipment necessary to remove a low pressure 320-tons centrifugal chiller #2, R123, SUVA to be replaced with a new state of the art magnetic unit including the addition of VFD and two (2) new automated chilled water control valves inside the central

    From: MerX (Federal)

  • PROVIDE ALL LABOR, SUPERVISION, MATERIALS, AND EQUIPMENT NECESSARY TO TWO FAILED CHILLED WATER CONTROL VALVES AND ELECTRIC ACTUATORS ON CHI...

    Type : Contract

    Due : 18 Sep, 2023 (7 months ago)
    Posted : 12 months ago
    Started : 05 Apr, 2023 (12 months ago)

    PROVIDE ALL LABOR, SUPERVISION, MATERIALS, AND EQUIPMENT NECESSARY TO TWO FAILED CHILLED WATER CONTROL VALVES AND ELECTRIC ACTUATORS ON CHILLER #1 LOCATED AT 650 CAPITOL MALL, SACRAMENTO, CA 95814 Solicitation ID/Procurement Identifier: 47PK0221A0003 Ultimate Completion Date: Mon Sep 18 17:00:00 GMT 2023

    From: Federal Procurement Data System (Federal)

  • Concordia Hospital Chiller Replacement Project

    Type : Bid Notification

    Due : 30 Jan, 2023 (15 months ago)
    Posted : 15 months ago
    Started : 09 Jan, 2023 (15 months ago)

    A new chiller is to be provided along with new pumps, piping, cooling towers, etc. .2 Work will also comprise of the installation of new controls for the chiller plant along with controls for existing air handlers in the hospital. .3 Air dampers and chilled water control valves will be replaced on the above noted air handlers. .4 Refer to other sections in this project manual. .5 Refer to project drawings.

    From: MerX (Federal)

  • Coastal Process Environmental Health Lab, Building System Cumulative Deficiencies

    Type : Bid Notification

    Due : 21 Apr, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 22 Mar, 2022 (about 2 years ago)

    Below is the proposed scope of work for this project: - Install Lightning Protection System at IMS Coker Hall, Coastal Processes, Fisheries Research Lab - Repairs to Electrical Distribution System at IMS Fisheries Research Lab - Replace Air Handling Unit 1, Ductwork, and Terminal Units at IMS Fisheries Research Lab - Repair Air Handling Units 1 and 2, Replace Chilled Water Control Valve and Water Heater at IMS Coastal Process Building

    From: North Carolina University (Higher Education)

  • Building Automation System, NLAE Modernization, Ames, IA

    Type : Bid Notification

    Due : 01 Jan, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 18 Dec, 2017 (about 6 years ago)

    additional specialized training to USDA or ISU personnel.The programming and hardware for the project generally includes HVAC systems, including VAV box controllers, VFD controllers, pump controllers, thermostats humidistats, fume hood controls, fans for supply, return, exhaust, and heat recovery, steam actuators, chilled water control valves and chilled water control systems for plant growth and root (rhizotron) environmental growth chambers.

    From: Federal Government (Federal)

  • Air Handler at Valdosta Regional Airport

    Type : Bid Notification

    Due : 07 Jul, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 28 May, 2020 (about 3 years ago)

    The system must be compatible with the current HVAC controls. 2. The contractor must meet the requirement of the statute “BUY AMERICAN”. 3. The system will be designed by the contractor and proposed in the bid. 4. The system must be at least equal or greater in tonnage capacity. 5. The chilled water pump of equal or greater size will be installed at the same time. 6. A chilled water control valve must be installed during the installation. 7.

    From: Georgia (State)