Type : Bid Notification
Contractor shall provide labor and material to install new 0-10 VDC chilled water control valve, connect chilled water valve lines from the isolation valve to the unit, connect drain line, and insulate newly installed line with Armaflex insulation. Contractor shall provide labor to leak check, start and test valve for proper operation. Upon completion contractor will contact COR (Gustavo Flores) to inform him of the completion of service.