Search results for: chiller hardware

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 78
  • Chiller Hardware Software

    Type : Bid Notification

    Due : 29 Jul, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 14 Jul, 2021 (about 2 years ago)

    The Naval Surface Warfare Center Philadelphia intends to procure Chiller Hardware Software on a Sole Source basis from United Refrigeration Inc.The proposed contract action is for supplies or services for which the Government intends to solicit and award with only one source under authority of FAR 13.106 (b).Any questions regarding this notice should be emailed to: stephanie.destefano

    From: Federal Government (Federal)

  • Probe Station Thermal Chuck Chiller and Controller

    Type : Pre-Bid Notification

    Due : 30 Jul, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 15 Jul, 2021 (about 2 years ago)

    Temperature Range: -60/+200 Deg.C.Temperature Controller: includes IEEE-488 and RS-232 I/O communications, programmable cycle/ramp/soak; 115 Volt 60Hz, 100V 50HzChiller: Stand-alone, self-contained cooler circulator; 115 Volt 60Hz, 100V 50HzDue to failure of current chiller unit and hardware obsolescence, the chiller and temperature controller must be replaced. 

    From: Federal Government (Federal)

  • Air Cooled Chiller Replacement

    Type : Bid Notification

    Due : 28 Jul, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 28 Jun, 2021 (about 2 years ago)

    Contractor shall remove existing 20 Ton Drake Packaged Air Cooled Chiller and associated hardware, parts and components; to include, but not limited to:Detaching from electrical connections; Reclaimingrefrigerant; Removing 20 Ton Drake Packaged AirCooled Chiller from roof top; Removing chiller waterpiping; Removing plate framed heat exchanger;Removing associated hardware, parts and componentsAND Replace the 20 Ton Drake Packaged Air CooledChiller

    From: Federal Government (Federal)

  • Replacement of Chiller #1 at DFAS

    Type : Bid Notification

    Due : 09 Dec, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 09 Nov, 2020 (about 3 years ago)

    The new chiller shall be compatible with the existing chilled water system control system, so that it may be controlled in the same manner as the existing chiller. The new chiller shall be integrated into the chilled water system, to include that hardware and software configurations for the new chiller shall be similar to that of the existing chiller.

    From: Federal Government (Federal)

  • J--Notice of Intent - Maintenance of GE Imaging Systems

    Type : Bid Notification

    Due : 30 Nov, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 16 Nov, 2018 (about 5 years ago)

    The major systems are: a) GE Medical MRI 1.5T Scanner including Magnet support, Chiller Cryogen support, UPS and hardware and software support on the workstations, b) GE CT Scanner 64 slice and support hardware and software workstations, c) GE Infinia Hawkeye Nuclear Cameras, support hardware and software workstations, d) GE Xeleris workstations hardware and software, e) GE PET Discovery VCT, f) GE XR Innova 4100 radiographic rooms, g) GE LogicQ e

    From: Federal Government (Federal)

  • K--640-19-2-5081-0022 Bldg.7 Chiller #2 Replacement (VA-19-00027663)

    Type : Bid Notification

    Due : 17 May, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 13 May, 2019 (about 5 years ago)

    Site location is at the Palo Alto Campus, 3801 Miranda Avenue, Palo Alto CA, 94304.This project is to remove/dispose of the current air-cooled water chiller, and the installation and integration of a new air-cooled water chiller to include all required hardware and equipment to create a full and complete operating system.The construction period of performance will be 90 days from issuance of Notice to Proceed (NTP).

    From: Federal Government (Federal)

  • Replacement of Chiller #1 at DFAS

    Type : Bid Notification

    Due : 16 Dec, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 07 Dec, 2020 (about 3 years ago)

    The new chiller shall be compatible with the existing chilled water system control system, so that it may be controlled in the same manner as the existing chiller. The new chiller shall be integrated into the chilled water system, to include that hardware and software configurations for the new chiller shall be similar to that of the existing chiller.

    From: Federal Government (Federal)