Type : Award
Emergency Chiller Redundancy for AHU1, AHU2, and AHU7 Serving all Operating Rooms at Miami VA Medical Center. Project number 546-23-128.
Emergency Chiller Redundancy for AHU1, AHU2, and AHU7 Serving all Operating Rooms at Miami VA Medical Center. Project number 546-23-128.
Type: BidAgency Type: Federal State: DelawareDate Entered: 06/02/2017 Due Date: 07/03/2017
The project consists of new chilled water supply and return piping to the future Football Operations Facility (FS-262) from FSU Satellite Chiller Plant 1 and including a connection to the Doak Campbell Stadium Chiller Plant for redundancy purposes, and valves for future connection to other buildings.
Building 101 is currently served by the same chiller as Building 100. This project will modify existing piping to allow Building 100 & 101 to each be served by their own dedicated chiller, with tie-ins maintained to allow for either chiller to provide redundancy to the other. Period of Performance is 240 days from issuance of Notice To Proceed.
Plano Independent School District is requesting Competitive Sealed Proposals for: Beverly Elementary School HVAC Renovations SCOPE OF WORK: The scope of work involves a range of enhancements to the HVAC system in the central plant, encompassing the installation of condensing boilers, replacement and reconfiguration of the existing air-cooled chiller with a new one, adding an additional air-cooled chiller for redundancy, installation of hydronic pumps
PART 2 - SCOPE OF WORK OVERVIEW: 585-21-116 Replace Chiller Plant Phase 2 will replace three (3) of the existing 250-ton chillers to account for future cooling demand and N+1 redundancy plus design a chiller sized for spring/fall operation with the ability to run in low ambient air temperature conditions. Phase 2 will also include eliminating electrical panel X-Chill and refeeding all circuits from Building 11.
A&E CREATE REDUNDANCY - CHILLERS Solicitation ID/Procurement Identifier: 36C24819D0021 Ultimate Completion Date: Thu Dec 14 18:00:00 GMT 2023