Search results for: chillers and cooling tower

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 1,048
  • Cooling Tower and Chiller Replacement

    Type : Bid Notification

    Due : 15 Apr, 2024 (in 17 days)
    Posted : 5 days ago
    Started : 22 Mar, 2024 (5 days ago)

    This Request for Qualification is for the design and construction administration service of this project which will involve: • Replacement of two (2) existing water-cooled chillers, cooling tower, existing chilled water primary and condenser pumps with a new air-cooled chiller.

    From: North Carolina Electronic (Other)

  • Chillers and Cooling Tower Replacements (Campuswide)

    Type : Bid Notification

    Due : 03 Oct, 2023 (5 months ago)
    Posted : 7 months ago
    Started : 18 Sep, 2023 (6 months ago)

    FOR: Chillers and Cooling Tower Replacements (Campuswide) Baton Rouge Community College Baton Rouge, Louisiana PROJECT NUMBER: 01-107-18-02, F.01004265 & 19-671-22-01, F.19002458 (Supplement) Complete Bidding Documents for this project are available in electronic form. They may be obtained without charge and without deposit from Eyre Engineering, LLC.

    From: Louisiana Division of Administration (State)

  • Chiller and Cooling Tower Change out

    Type : Bid Notification

    Due : 05 Dec, 2022 (15 months ago)
    Posted : 16 months ago
    Started : 04 Nov, 2022 (17 months ago)

    Chiller and Cooling Tower Change out postdate:- 04-Nov-2022 12:00:00 PM responsedate:- 05-Dec-2022 02:00:00 PM ( 23h, 43m+ ) description:- Removal and disposal of existing chiller per EPA guidelines. b. Furnish and install new 500 ton Daikin Mag Bearing chiller or equal per attached specifications. c. Furnish and install new piping modifications to cooling tower water piping to connect both chillers to new cooling tower. d.

    From: Magnolia Regional Health Center (Healthcare)

  • Replacement of Existing Water Cooled Chillers *RFP*

    Type : Bid Notification

    Due : 19 Apr, 2024 (in 22 days)
    Posted : 12 days ago
    Started : 18 Mar, 2024 (9 days ago)

    Project Name and Location: Chiller & Cooling Tower Replacement,Senator Paul Simon Federal Building, 250 West Cherry Street, Carbondale, IL 62901Project Summary Description: Replace existing water cooled chillers and associated cooling tower,pumps, piping, controls, motor control center, etc. as indicated in the drawings and specified herein.Minor site regrading, concrete foundations and slab-on-grade, and metal fencing will be included in theproject

    From: Federal Government (Federal)

  • Cooling tower parts for the repair of two chillers

    Type : Bid Notification

    Due : 04 Sep, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 29 Aug, 2020 (about 3 years ago)

    Looking for a vendor to provide an assortment of BAC cooling tower parts for the repair of two chillers. Model#: FXV-442 Serials#'s: U052124502 and U052124501 Attachment 1 - Bid Form enclosed

    From: Iowa Department of Administrative Services (State)

  • Cooling tower parts for the repair of two chillers

    Type : Bid Notification

    Due : 04 Sep, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 29 Aug, 2020 (about 3 years ago)

    Looking for a vendor to provide an assortment of BAC cooling tower parts for the repair of two chillers. Model#: FXV-442 Serials#'s: U052124502 and U052124501 Attachment 1 - Bid Form enclosed

    From: Iowa Department of Administrative Services (State)

  • 23-04517 CHILLER AND COOLING TOWER REPLACEMENT

    Type : Bid Notification

    Due : 24 Mar, 2023 (12 months ago)
    Posted : 12 months ago
    Started : 07 Mar, 2023 (12 months ago)

    Installation of two (2) water-cooled chillers previously purchased by IEHP, along with replacement cooling tower, piping, valves, appurtenances, and controls. Relocation of the existing chemical water treatment system. Relocation of the existing solids separator pump.

    From: Inland Empire Health Plan (Other)