Search results for: citywide trip hazard

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 46
  • Citywide Trip Hazard Removal Services

    Type : Bid Notification

    Due : 01 Jul, 2022 (22 months ago)
    Posted : 22 months ago
    Started : 16 Jun, 2022 (22 months ago)

    Description: The Service Provider will provide Services that consist of the removal of concrete tripping hazards from sidewalks, curb ramps, and concrete curbing in the City of Charlotte’s sidewalk system that the City or its agents have identified. The identified concrete tripping hazards will be repaired without use of typical destructive construction methods, i.e. panel demolition and replacement.

    From: Charlotte (City)

  • BID - Citywide Asphalt and Concrete On-call Repair Services Project

    Type : Bid Notification

    Due : 08 May, 2024 (in 12 days)
    Posted : 21 days ago
    Started : 03 Apr, 2024 (22 days ago)

    Project Title BID - Citywide Asphalt and Concrete On-call Repair Services Project Invitation # 2024-040324 Bid Posting Date 04/03/2024 2:36 PM (PDT) Project Stage Bidding Bid Due Date 05/08/2024 2:00 PM (PDT) Response Format Electronic Project Type Bid Response Types Line Items Bid Bond General Attachment General Attachment General Attachment Type of Award Lump Sum Categories 237990 - Other Heavy and Civil Engineering Construction 333618 - Other Engine

    From: Menlo Park (City)

  • Construction Management Services For FY-25 Local Sidewalk Restoration Citywide Project.

    Type : Bid Notification

    Due : 08 Dec, 2023 (4 months ago)
    Posted : 5 months ago
    Started : 18 Oct, 2023 (6 months ago)

    Thus, the District seeks the services of a qualified professional firm to assist in the management of this citywide local sidewalk restoration contract.

    From: Washington DC (State)

  • 22-30 Water Plant 4160V Electrical System Reliability Project

    Type : Bid Notification

    Due : 14 Jun, 2022 (22 months ago)
    Posted : about 2 years ago
    Started : 21 Apr, 2022 (about 2 years ago)

    Risk Assessment – analyze the appropriate panels to determine the following data: 8.4.3.1 Flash hazard boundary (inches) 8.4.3.2 Incident energy (Cal/cm2) at 18 inches 8.4.3.3 Hazard risk category (Level, 2, 3, or 4) 8.4.3.4 Glove class 8.4.3.5 Required PPE 8.4.3.6 Shock hazard (volts) 8.4.3.7 Limited approach boundary 8.4.3.8 Equipment name and ID 8.4.3.9 Date of analysis 8.4.4 Labeling 8.4.4.1 Provide and attach an equipment warning sticker at

    From: Evanston (City)

  • DOCKLESS SCOOTER SYSTEMS (RFP)

    Type : Bid Notification

    Due : 26 Feb, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 04 Feb, 2021 (about 3 years ago)

    Employee Education and Training Provide education and training to all contractors employees before they are exposed to potential workplace or other hazards as required by specific OSHA Standards. 7.

    From: Raleigh (City)

  • Removal of Concrete Sidewalk Trip Hazards

    Type : Bid Notification

    Due : 09 May, 2024 (in 13 days)
    Posted : 1 day ago
    Started : 23 Apr, 2024 (2 days ago)

    Removal of Concrete Sidewalk Trip Hazards2024-TOB-RFQ-008Closing Date: 05/09/2024 02:00:00 PM ETDetail: This Request for Quotation (RFQ) calls for the removal of approximately 142 concrete sidewalk trip hazard locations throughout the urban core of the municipality by cutting the concrete on an angle.

    From: Bracebridge (Town)

  • Transportation Safety Action Plan

    Type : Bid Notification

    Due : 02 May, 2024 (in 6 days)
    Posted : 13 days ago
    Started : 11 Apr, 2024 (14 days ago)

    Washington County is conducting this solicitation to find a contractor to help develop a Transportation Safety Action Plan (TSAP) to improve roadway safety by significantly reducing or eliminating roadway fatalities and serious injuries for all users, including pedestrians, bicyclists, public transportation users, motorists, personal conveyance and micromobility users, and commercial vehicle operators. The County completed a Transportation Safety Action Plan (TSAP) in 2016. Since then, the County has adopted new policies such as Equitable Community Engagement, updated practices as in our Complete Streets Road Standards, and implemented proven countermeasures projects through ODOT ARTS, HSIP and local funding. The County has secured a Safe S...

    From: Washington County (County)