Search results for: class ii bicycle

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 30
  • MIDDLEFIELD ROAD CLASS II BICYCLE LANES IMPROVEMENTS PROJECT

    Type : Bid Notification

    Due : 11 Mar, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 21 Feb, 2019 (about 5 years ago)

    ADVERTISEMENT FOR BIDS TOWN OF ATHERTON STATE OF CALIFORNIA Notice: The Town of Atherton (Town) hereby gives notice that it will accept bids for construction of the following public work: MIDDLEFIELD ROAD CLASS II BICYCLE LANES IMPROVEMENTS PROJECT Project Number: 56081 1.

    From: Atherton (Town)

  • Camino Pablo Bicycle Route Corridor Improvements RFP

    Type : Bid Notification

    Due : 11 Apr, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 11 Mar, 2019 (about 5 years ago)

    a class II bicycle lane (buffered when possible) between the SR-24 off-ramp and the BART station, add green paint to conflict zones, and install sharrows at the Theatre square area leading to and from the St.

    From: Orinda (City)

  • Bike Route/Lane Improvements Bakersfield College Area

    Type : Bid Notification

    Due : 01 Feb, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 06 Jan, 2022 (about 2 years ago)

    II bicycle lanes and 7.87 miles of bicycle route signs around the Bakersfield College area.

    From: Bakersfield (City)

  • Mailbox Only - Engineering Services for E Street Project

    Type : Bid Notification

    Due : 16 Jan, 2024 (3 months ago)
    Posted : 4 months ago
    Started : 15 Dec, 2023 (4 months ago)

    Also, reconstructing curb ramps to meet ADA compliance, filing sidewalk gaps, reconfiguring the roadway by reducing the number of travel lanes allowing for the installation of buffered Class II bicycle lanes. Traffic signal modifications at the intersection of Tulare and Fresno Street. Please see attached Grant Application Preliminary Plans for reference.

    From: Fresno (City)

  • Mailbox Only - Consulting Services For The Cedar Avenue Roadway Improvements Project

    Type : Bid Notification

    Due : 23 Oct, 2023 (6 months ago)
    Posted : 7 months ago
    Started : 27 Sep, 2023 (7 months ago)

    Additional improvements include reconstruction of several non-ADA complaint curb ramps, installation of new pedestrian push buttons, median nose adjustments, drive approach reconstruction, sidewalk repairs, traffic loop replacements, road reconfiguration to include buffered Class II bicycle lanes, new signage and stripping.

    From: Fresno (City)

  • AVENUE R COMPLETE STREETS AND SAFE ROUTES PROJECT - ATPL - 5378(049)

    Type : Bid Notification

    Due : 18 Jan, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 02 Dec, 2021 (about 2 years ago)

    The project incorporates a “Complete Street” with completed sidewalk gaps, ladder-style crosswalks to increase visibility, bus turnouts to provide enhanced access to public transit, as well as Class II bicycle lanes.

    From: City of Palmdale (City)

  • VINEYARD ROAD IMPROVEMENT PROJECT,CIP Project No. 15-017; Federal Aid # STPL-5361 (027)

    Type : Bid Notification

    Due : 23 Oct, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 28 Sep, 2018 (about 5 years ago)

    The work to be done includes, but is not limited to: a comprehensive pavement rehabilitation (Cold In-Place Recycling 4”, 6’ daylight/edge grind, profile plane 0.15’ at conforms and pave HMA surface course 0.15’) of the existing roadway with roadway shoulder widening (12” max. deep-lift HMA, width varies 0.5’-4.5’); drainage improvements at intersection of Vineyard Road and Eucalyptus Avenue; inclusion of Class II and Class III bicycle facilities

    From: Novato (City)