Type : Bid Notification
23-013 Beverly Middle School Outdoor Classroom Turf Bid No.23-013 23-013 Beverly Middle School Outdoor Classroom Turf Status: Closes: Open 6/13/2023 11:00 AM
23-013 Beverly Middle School Outdoor Classroom Turf Bid No.23-013 23-013 Beverly Middle School Outdoor Classroom Turf Status: Closes: Open 6/13/2023 11:00 AM
C) Concord Avenue turf areas as shown (Appendix C) Blacks Nook outdoor classroom turf area Payson Park grass as shown (Appendix D) Stony Brook Dam turf areas as shown (Appendix G) Winter Street Dam turf areas as shown (Appendix H) - Department of Conservation & Recreation land from the Concord Avenue Rotary to Huron Avenue from the Parkway curb to the wood edge of the Reservation. - Department of Conservation & Recreation rotaries are at
Jun 6, 2017 2:00 pm Playground, turf, track, classroom, walkways, native plantings, etc.. Nathan Davis ES - 3014 W 39th Place(Bid) Only Pre-Qualified General Contractor Vendors are invited to submit bids. DUE DATE HAS BEEN EXTENDED TO 6/6/17. Procurement - 42.
High School Gym Floor Info & Bid Form 6/4/24
Jun 6, 2017 2:00 pm Storm drain installation, new artificial turf field, outdoor classroom, basketball court, permeable Audubon Elem - 3500 N. Hoyne(Bid) Only Pre-Qualified GENERAL CONTRACTORS are invited to submit bids. Procurement - 42 W. Madison St., Garden Level For documentation pick up, please contact Michell Bowman, Tilton, Kelly + Bell, 55 W.
The project includes construction of a new five (5) story Arlington Career Center (ACC) building, partial demolition of the existing ACC building, the construction of a new four (4) story parking garage, the removal of the relocatable classrooms, the construction of a new synthetic turf playfield, and associated sitework on-site and streetscape work surrounding the site.Scopes of work include: demo, concrete, precast concrete, masonry, structural
Scope of work in included in these construction documents includes but is not necessarily limited to Removal of turf and construction of two outdoor classrooms with landscape buffer and pathways between classrooms. Classroom 1 (The Grove”) and Classroom 2 (The Theater”) with steel structured covered canopies to provide shade. Upgraded site lighting, irrigation, and power.