Type : Bid Notification
Coordinate logistics and setup for any and all required equipment with CM. Provide CM with minimum 2 weeks notice prior to mobilization of equipment for confirmation of site logistics. 13. NOTE: Project will have exterior vertical transportation (construction hoist) for use for materials and personnel as concrete floors are poured. Assume car capacity is 6000 lbs. Approx. Dimensions of cars will be 12’4”L x 4’8”W x 7’2”H. a.