Type : Bid Notification
Related Documents: IFB 24096-JT Find and Fix Collection System ACS Laterals and Misc Return To Main Bid Postings Page
People also searched for
Related Documents: IFB 24096-JT Find and Fix Collection System ACS Laterals and Misc Return To Main Bid Postings Page
system rehabilitation to perform design and design services during construction for the Murrieta sewer collection system including a rehabilitation project to reduce storm water and ground water infiltration and inflow into the system and in addition, provide smoke testing or other appropriate methods to find the un-metered connections to an area of the collection system.
The project’s approach includes providing CEI services for construction that comprises of both decommissioning of existing outdated and problematic wastewater collection systems and the construction of new wastewater collection systems.
of treatment plant and collection system capital improvement projects.
Collection System Improvements Agency: Interlaken, Village of Category:Utilities & Green Energies - Construction Issue Date:02/23/2024 Due Date: 03/27/2024 Ad Type:General
2024 Collection System Project (Prequalified Contractors) 04/16/2024 Coeur d'Alene
Scope, Specifications, and Technical Requirements The scope of work includes all labor, materials, and supervision required to complete the milling and resurfacing of Parking Lot 10 on the UNF campus, and implement stormwater management improvements including curbs, gutters, concrete flumes, grate inlets, and grading adjustments to efficiently channelize stormwater runoff to the proposed stormwater collection system.