Type : Bid Notification
Answer: The Contractor shall quote the typical delivery time for the Compact Hybrid Manufacturing System being offered based on an award issued on or before September 22, 2022.The submission deadline for quotes is UNCHANGED.
Answer: The Contractor shall quote the typical delivery time for the Compact Hybrid Manufacturing System being offered based on an award issued on or before September 22, 2022.The submission deadline for quotes is UNCHANGED.
This requires acquiring a compact hybrid manufacturing cell that enables laser deposition of metal powder using powder feeders that supports precision control of small volumes of powder and permits open access to all of the processing data. The hybrid manufacturing system will require a deposition head and laser optics that are compatible with programmable 1 kW fiber laser and integrate with small volume powder hoppers.
UOM Requested Delivery P1 AM770 AM Hybrid Manufacturing System 1 EA - Each 23153022 - Power feeder | 5753 $5k, 8425 AM770 AM Hybrid Manufacturing System Enclosure - Steel enclosure with internal soft enclosure for localized inert environment.