Type : Bid Notification
Matrix.xlsx Table D-1: Project Cost Table and Staffing Matrix23 KB 21-0328.00 East Bank Compressed Air Infrastructure Study FINAL.pdf East Bank Compressed Air System Infrastructure Study3.22 MB
Matrix.xlsx Table D-1: Project Cost Table and Staffing Matrix23 KB 21-0328.00 East Bank Compressed Air Infrastructure Study FINAL.pdf East Bank Compressed Air System Infrastructure Study3.22 MB
Matrix.xlsx Table D-1: Project Cost Table and Staffing Matrix23 KB 21-0328.00 East Bank Compressed Air Infrastructure Study FINAL.pdf East Bank Compressed Air System Infrastructure Study3.22 MB Addendum1.zip Addendum # 1 Documents5.98 MB
Matrix.xlsx Table D-1: Project Cost Table and Staffing Matrix23 KB 21-0328.00 East Bank Compressed Air Infrastructure Study FINAL.pdf East Bank Compressed Air System Infrastructure Study3.22 MB Sign-in Sheet.jpg Addendum # 1: Pre-Proposal Meeting Sign-in Sheet780 KB
Grand Coulee Dam, Industrial Area Compressed Air Upgrades, Columbia Basin Project, WashingtonSee sources sought attachment
aftercooler, moisture separator with electric auto drain• Rated for continuous dutyREFRIGERATED COMPRESSED AIR DRYER REQUIREMENTSThe refrigerated compressed air dryer shall meet the following specifications:• Operating Pressure: 115 PSIG, 130 PSIG max.• Operating Flow Rate: 600 ACFM at 115 PSIG• Water cooled oil cooler and air aftercooler, moisture separator with electric auto drain• Power Supply:
See attachment for Amendment 0012, reminder: there are no Amendments 0001-0002 and 0004-0011.See attachment for Amendment0003, there are no Amendments 0001 or 0002 due to system glitch.See attached for Solicitation and J&A.
COMPRESSED AIR SYSTEM UPGRADE Solicitation ID/Procurement Identifier: 75N92023P00389 Ultimate Completion Date: Wed Jan 31 18:00:00 GMT 2024