Search results for: concepts utilizing

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 64
  • LAUNCH <b>CONCEPTS</b> <b>UTILIZING</b> MODULAR PROPULSION SYSTEMS

    LAUNCH CONCEPTS UTILIZING MODULAR PROPULSION SYSTEMS

    Type : Contract

    Due : 30 Sep, 2024 (in 4 months)
    Posted : about 2 years ago
    Started : 30 Sep, 2024 (in 4 months)

    LAUNCH CONCEPTS UTILIZING MODULAR PROPULSION SYSTEMS Solicitation ID/Procurement Identifier: FA930020D3001 Ultimate Completion Date: Mon Sep 30 17:00:00 GMT 2024

    From: Federal Procurement Data System (Federal)

  • LAUNCH <b>CONCEPTS</b> <b>UTILIZING</b> MODULAR PROPULSION SYSTEMBS PHASE III SBIR

    LAUNCH CONCEPTS UTILIZING MODULAR PROPULSION SYSTEMBS PHASE III SBIR

    Type : Contract

    Due : 30 Sep, 2024 (in 4 months)
    Posted : about 2 years ago
    Started : 30 Sep, 2024 (in 4 months)

    LAUNCH CONCEPTS UTILIZING MODULAR PROPULSION SYSTEMBS PHASE III SBIR Solicitation ID/Procurement Identifier: FA930020D3001 Ultimate Completion Date: Mon Sep 30 17:00:00 GMT 2024

    From: Federal Procurement Data System (Federal)

  • Providers of Mathematics Blended Instruction

    Type : Bid Notification

    Due : 21 Sep, 2017 (about 6 years ago)
    Posted : about 6 years ago
    Started : 23 Aug, 2017 (about 6 years ago)

    The intent of Math Innovation Zones is to dramatically increase math achievement in the State of Texas and provide an opportunity for students to demonstrate true mastery of mathematical concepts utilizing proven blended learning instructional methods. The TEA reserves the right to select and contract with more than one qualified providers from the pool of qualified respondents.

    From: Texas (State)

  • Unified Network Operations (UNO) Request for Information (RFI)

    Type : Bid Notification

    Due : 10 Feb, 2023 (14 months ago)
    Posted : 15 months ago
    Started : 23 Jan, 2023 (15 months ago)

    utilizing digital information management systems to design, engineer, build, operate and maintain complex integration projects?

    From: Federal Government (Federal)

  • CMGC - I-405 ATM/ICM Project

    Type : Bid Notification

    Due : 29 Apr, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 15 Mar, 2021 (about 3 years ago)

    This project proposes to install ATM/ICM concepts with utilizing several types of DMS on seven (7) gantry locations throughout the project limits, closed circuit television (CCTV) camera, changeable message signs (CMS), dynamic message signs (DMS) and flashing beacons for queue warning, vehicle detection stations (VDS) and maintenance vehicle pullouts (MVP). The new ATM/ICM feature needs to be incorporated into the LARTMC operation.

    From: California (State)

  • Initial Design and Scope Development (SAES) for Rapid City Service Unit

    Type : Bid Notification

    Due : 09 May, 2017 (about 7 years ago)
    Posted : about 7 years ago
    Started : 06 May, 2017 (about 7 years ago)

    Concept development services to include at least three conceptual solutions for the building design and site layout , including block layout of the various departments, on-site presentation of proposed concepts utilizing BIM site plan and three dimensional modeling for both the building and site, development of Basis of Design (BOD) and NEPA compliance plan, workshop with IHS on concept selection with final concept /selection and Phased Construction

    From: Federal Government (Federal)

  • Space Environment Rapid Prototyping Services

    Type : Bid Notification

    Due : 27 Apr, 2024 (5 days ago)
    Posted : 20 days ago
    Started : 12 Apr, 2024 (21 days ago)

    Due to AANA’s extensive knowledge in prototyping and the experience in the previous 5 phases of the CEV and Orion Spacecraft Cockpit prototyping, AANA is uniquely positioned to continue to perform and evolve these tasks beyond the cockpit.Interested parties shall be able to further develop the tools and concepts created during previous phases seamlessly utilizing ideas and lessons learned from the five previous phases which involved the CEV and Orion

    From: Federal Government (Federal)