Type : Contract
AIR CONDITION AND HEATING EQUIPMENT Solicitation ID/Procurement Identifier: 19AQMS22P0403 Ultimate Completion Date: Fri Dec 30 18:00:00 GMT 2022
AIR CONDITION AND HEATING EQUIPMENT Solicitation ID/Procurement Identifier: 19AQMS22P0403 Ultimate Completion Date: Fri Dec 30 18:00:00 GMT 2022
Disconnect all heating plant equipment to be removed, remove conduit wiring upto electrical panels, make services safe.2. Connect new boilers, pumps, unit heaters, etc. to the existing electrical panel.3. Provide new wiring and breakers as required.4. Perform any other work required by this contract Bid Document Access: Bid document preview, bid opportunity, and award notices are available on the site free of charge.
Product Service Code:- 41 - REFRIG, AIR CONDIT/CIRCULAT EQPT NAICS Code:- 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing Primary point of contact:- Florence Robinson-JonesDSN(312) 737-8600 florence.robinson@dla.mil Secondary point of contact:-
Product Service Code:- 41 - REFRIG, AIR CONDIT/CIRCULAT EQPT NAICS Code:- 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing Primary point of contact:- Michael T. Nicolardi215-737-8684 MICHAEL.NICOLARDI@DLA.MIL Secondary point of contact:-
Product Service Code:- 41 - REFRIG, AIR CONDIT/CIRCULAT EQPT NAICS Code:- 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing Primary point of contact:- Michael T. Nicolardi215-737-8684 MICHAEL.NICOLARDI@DLA.MIL Secondary point of contact:-
Product Service Code:- 41 - REFRIG, AIR CONDIT/CIRCULAT EQPT NAICS Code:- 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing Primary point of contact:- Janice DiBuono215-737-7043 Janice.DiBuono@dla.mil Secondary point of contact:-
Design work will include upgrades and repairs to the existing vaults to address the current water boil off condition in the two steam vaults leading to the Fisher House (B300), and connecting of steam piping from the vault to Q1-4. The two steam vaults are shown in the sketch contained in attached SOW. Design will also involve adding new steam heating equipment to Quarters 1.