Search results for: conduct an electrical survey

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 96
  • REPLACE BOILER AND ELECTRICAL PANELS AND CONDUCT AN ELECTRICAL SURVEY AT THE BROADVIEW SSA, LOCATED IN BROADVIEW, IL

    Type : Contract

    Due : 01 Nov, 2022 (17 months ago)
    Posted : 21 months ago
    Started : 02 Aug, 2022 (21 months ago)

    REPLACE BOILER AND ELECTRICAL PANELS AND CONDUCT AN ELECTRICAL SURVEY AT THE BROADVIEW SSA, LOCATED IN BROADVIEW, IL Solicitation ID/Procurement Identifier: 70CMSW22R00000020 Ultimate Completion Date: Tue Nov 01 17:00:00 GMT 2022

    From: Federal Procurement Data System (Federal)

  • SERVICES TO CONDUCT AN ELECTRICAL RESISTANCE TOMOGRAPHY SURVEY AND REPORT FOR THE SAUGUS IRONWORKS NATIONAL HISTORIC SITE LOCATED IN...

    Type : Contract

    Due : 15 Jan, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 07 Aug, 2020 (about 3 years ago)

    SERVICES TO CONDUCT AN ELECTRICAL RESISTANCE TOMOGRAPHY SURVEY AND REPORT FOR THE SAUGUS IRONWORKS NATIONAL HISTORIC SITE LOCATED IN SAUGUS, MASSACHUSETTS Solicitation ID/Procurement Identifier: 140P4320Q0021 Ultimate Completion Date: Fri Jan 15 18:00:00 GMT 2021

    From: Federal Procurement Data System (Federal)

  • The contractor shall conduct assessment to develop a plan for replacing all window air conditioner units to split system units. The plan will identify wh...

    Type : Bid Notification

    Due : 21 Jul, 2017 (about 6 years ago)
    Posted : about 6 years ago
    Started : 21 Jun, 2017 (about 6 years ago)

    The contract will also include the survey of the existing electrical panels at Bldg 230, Fort Shafter to determine the existing load capacity of the electrical panel(s) prior to installation of the new air conditioning units. Lastly, contractor will evaluate the information from the existing electrical panel survey and develop a plan for replacing all window and malfunctioning units with split system units in Bldg 230.

    From: Federal Government (Federal)

  • B--Electrical ResistanceTomography Survey and Report

    Type : Bid Notification

    Due : 16 Sep, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 15 Sep, 2020 (about 3 years ago)

    The contractor shall provide all labor, materials, supplies, supervision, coordination, travel and management necessary to conduct an electrical resistance tomography survey and report for the Saugus Iron Works National Historic Site located in Saugus, Massachusetts in accordance with the Statement of Work (Attachment 1).

    From: Federal Government (Federal)

  • H261--Sources Sought 653-23-104 Electrical Study

    Type : Bid Notification

    Due : 02 Dec, 2022 (16 months ago)
    Posted : 17 months ago
    Started : 19 Nov, 2022 (17 months ago)

    Thermographic Survey Perform a thermographic survey of electrical equipment. Reference the ANSI/NETA-MTA to perform the thermographic survey. The thermographic survey shall be performed in accordance with NFPA 70B. Note all abnormal hotspots in the electrical system. Record results by building in a spreadsheet. Provide a summary of your findings, no more than one page. Electromagnetic Field Survey Perform an electromagnetic field survey.

    From: Federal Government (Federal)

  • Y--WA-ENTIAT DESIGN CONSTRUCT NEW GENERATOR

    Type : Bid Notification

    Due : 08 Jun, 2017 (about 6 years ago)
    Posted : about 7 years ago
    Started : 24 May, 2017 (about 7 years ago)

    Conduct an assessment of the underground electrical service to the hatchery building and identify code compliance deficiencies. 1.6 Prepare and submit a survey report summarizing sub-task 1.5.

    From: Federal Government (Federal)

  • Electrical System Survey US Embassy Kabul

    Type : Bid Notification

    Due : N/A
    Posted : about 8 years ago
    Started : 29 Apr, 2016 (about 8 years ago)

    Embassy in Kabul, AfghanistanThis solicitation will be for the performance of an Electrical System Survey to find the cause for high grounding current readings, within the Kabul 380V electrical distribution systems.The following is a brief description of the services required:• A two-person team shall conduct testing and checking of the five building electrical distribution systems.• Ground Current and voltage measurements shall be taken at pre-determined

    From: Federal Government (Federal)