Type : Contract
564-22-500 CONSTRUCT NEW WATER STORAGE FACILITY AT VHSO Solicitation ID/Procurement Identifier: 36C25622R0160 Ultimate Completion Date: Sat Feb 12 18:00:00 GMT 2028
564-22-500 CONSTRUCT NEW WATER STORAGE FACILITY AT VHSO Solicitation ID/Procurement Identifier: 36C25622R0160 Ultimate Completion Date: Sat Feb 12 18:00:00 GMT 2028
Purpose: Veterans Health Care Services of the Ozarks (VHSO)| Construct New Water Storage Facility | Project# 564-19-101.
The Veterans Health Care system of the Ozarks (VHSO) has a requirement to Construct New Water Tower/Storage Facility and demolish existing Water Tower Project #564-19-101. The RFP posting date is 17 April 2023 with proposals due 17 May 2023. The anticipated contract award date is approximately 30 calendar days or less after receipt of proposals. The recommended Period of Performance is 330 Calendar days after issuance of the Notice to Proceed.
Project Scope Summary:The Contractor must furnish all construction management, supervision, labor, material, equipment, tools, supplies, consumables, parts, and related services to construct a new 600,000-gallon elevated water tank located northeast of Building 9, including duplex water pumps, water piping, an emergency generator, a chlorine recirculation system for the tank, and demo the existing Water Tower Bldg. 39.
03-1H2604 03-Nev-80-19.3 *** NEVADA COUNTY IN TRUCKEE AT THE DONNER PASS COMMERCIAL VEHICLE ENFORCEMENT FACILITY SEE ATTACHMENT
The Veterans Health Care system of the Ozarks (VHSO) has a requirement to Construct New Water Tower/Storage Facility and demolish existing Water Tower Project #564-19-101. The RFP posting date is 17 April 2023 with proposals due 17 May 2023. The anticipated contract award date is approximately 30 calendar days or less after receipt of proposals. The recommended Period of Performance is 330 Calendar days after issuance of the Notice to Proceed.
The Veterans Health Care system of the Ozarks (VHSO) has a requirement to Construct New Water Tower/Storage Facility and demolish existing Water Tower Project #564-19-101. The RFP posting date is 17 April 2023 with proposals due 17 May 2023. The anticipated contract award date is approximately 30 calendar days or less after receipt of proposals. The recommended Period of Performance is 330 Calendar days after issuance of the Notice to Proceed.