Search results for: constructing

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 257
  • Eliminate the existing CR 193 at-grade intersection with SR 15 by constructing a grade separation.

    Type : Bid Notification

    Due : 30 Jan, 2025 (in 9 months)
    Posted : 2 months ago
    Started : 04 Feb, 2024 (2 months ago)

    1 HAN 114008 Intersection Improvement (Safety) HAN SR 15/CR 193 1/30/2025 $5,648,348 Standard Build Eliminate the existing CR 193 at-grade intersection with SR 15 by constructing a grade separation.

    From: Ohio Department of Transportation (Transportation)

  • Daviess Board of Commissioners is seeking LOI’s from Consultants interested in an Intersection Improvement Project. Constructing a Roundabout at the Inte...

    Type : Bid Notification

    Due : 10 May, 2024 (in 12 days)
    Posted : 16 days ago
    Started : 27 Mar, 2024 (1 month ago)

    Final selection ranking will be determined by: The weighted score totals with the highest score being the top ranked firm Rank totals with the lowest rank total being the top ranked firm Requirements for Letters of Interest (LOI) A. General instructions for preparing and submitting a Letter of Interest (LOI). 1. Provide the information, as stated in Item B below, in the same order listed and signed by an officer of the firm.

    From: Indiana Department of Transportation (Transportation)

  • <b>CONSTRUCTING</b> A FRAMEWORK TO SIMPLIFY DIGITIZING COLLECTIONS OF ASTRONOMICAL PHOTOGRAPHIC DATA

    CONSTRUCTING A FRAMEWORK TO SIMPLIFY DIGITIZING COLLECTIONS OF ASTRONOMICAL PHOTOGRAPHIC DATA

    Type : Contract

    Due : 13 Apr, 2025 (in 11 months)
    Posted : 4 days ago
    Started : 22 Apr, 2024 (4 days ago)

    CONSTRUCTING A FRAMEWORK TO SIMPLIFY DIGITIZING COLLECTIONS OF ASTRONOMICAL PHOTOGRAPHIC DATA Solicitation ID/Procurement Identifier: 80NSSC21K0886 Ultimate Completion Date: Sun Apr 13 17:00:00 GMT 2025

    From: Federal Procurement Data System (Federal)

  • PROJECT NP SLBE 5109(1): THE PROJECT CONSISTS OF <b>CONSTRUCTING</b> LEFT AND RIGHT TURNING LANES ON SOUTH DUNE HIGHWAY (M-109) AT DUNE CLIMB PARKING AREA (ROUTE 920). THE WORK INCLUDES GRADING; AGGREGATE BA...

    PROJECT NP SLBE 5109(1): THE PROJECT CONSISTS OF CONSTRUCTING LEFT AND RIGHT TURNING LANES ON SOUTH DUNE HIGHWAY (M-109) AT DUNE CLIMB PARKING AREA (ROUT...

    Type : Contract

    Due : 19 Aug, 2024 (in 3 months)
    Posted : 1 month ago
    Started : 25 Mar, 2024 (1 month ago)

    PROJECT NP SLBE 5109(1): THE PROJECT CONSISTS OF CONSTRUCTING LEFT AND RIGHT TURNING LANES ON SOUTH DUNE HIGHWAY (M-109) AT DUNE CLIMB PARKING AREA (ROUTE 920). THE WORK INCLUDES GRADING; AGGREGATE BA... Solicitation ID/Procurement Identifier: 693C7324R000011 Ultimate Completion Date: Mon Aug 19 17:00:00 GMT 2024

    From: Federal Procurement Data System (Federal)

  • THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, MATERIALS, AND EQUIPMENT, AND <b>CONSTRUCTING</b> SIX (6) RISER PIPE GRADE CONTROL STRUCTURES IN COAHOMA & BOLIVAR COUNTIES, MISSISSIPPI.

    THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, MATERIALS, AND EQUIPMENT, AND CONSTRUCTING SIX (6) RISER PIPE GRADE CONTROL STRUCTURES IN COAHOMA & BOL...

    Type : Contract

    Due : 31 Jul, 2025 (in 15 months)
    Posted : 4 months ago
    Started : 07 Mar, 2024 (1 month ago)

    THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, MATERIALS, AND EQUIPMENT, AND CONSTRUCTING SIX (6) RISER PIPE GRADE CONTROL STRUCTURES IN COAHOMA & BOLIVAR COUNTIES, MISSISSIPPI. Solicitation ID/Procurement Identifier: W912EE23B0015 Ultimate Completion Date: Thu Jul 31 17:00:00 GMT 2025

    From: Federal Procurement Data System (Federal)

  • Island Creek Repair and Armoring

    Type : Bid Notification

    Due : 30 Apr, 2024 (in 3 days)
    Posted : 11 days ago
    Started : 15 Apr, 2024 (11 days ago)

    The responses are for informational purposes only and do no obligate the Government or Contractor in any way.The work at Island Creek consists of modifying the top of the existing seepage berm to provide a 2% sloped surface for drainage, constructing one access ramp to the toe of the existing seepage berm, constructing a grass-lined ditch along the existing access road, constructing 4 small rock check dams along the grass-lined ditch, repairing and

    From: Federal Government (Federal)

  • Butner, NC Performance Stage Construction

    Type : Bid Notification

    Due : 29 Apr, 2024 (in 2 days)
    Posted : 22 days ago
    Started : 04 Apr, 2024 (22 days ago)

    This project consists of constructing a performance stage at Gazebo Park in Butner, NC to include necessary grading and installation of sidewalk and landscaping. An open pre-bid meeting will be held for all interested bidders on Wednesday, April 17th at 2:00PM at the site (415 Central Avenue). A site visit is highly recommended so that bidders can inspect the existing conditions.

    From: North Carolina Electronic (State)