Refine your Search
Apply several filters to get precise search results
Filters Applied Clear
Bid NotificationPre-Bid NotificationAwardContractActiveArchived
Search results for: contractor must replace
Showing opportunity 1 - 10 of 153
  • CONTRACTOR MUST REPLACE COOLING TOWER CONTROLLER (CHEMICAL FOOD EQUIPMENT) AT ROB.

    Type : Contract
    Due : 08 Jul, 2022 (2 months ago)
    Posted : 4 months ago
    Started : 06 May, 2022 (4 months ago)

    CONTRACTOR MUST REPLACE COOLING TOWER CONTROLLER (CHEMICAL FOOD EQUIPMENT) AT ROB. Solicitation ID/Procurement Identifier: 47PD0121A0001 Ultimate Completion Date: Fri Jul 08 17:00:00 GMT 2022

    From: Federal Procurement Data System (Federal)
  • CONTRACTOR MUST REPLACE HVAC POST 22 GUARDS BOOTH AT THE ST ELIZABETH CAMPUS

    Type : Contract
    Due : 08 Aug, 2022 (1 month ago)
    Posted : 4 months ago
    Started : 06 May, 2022 (4 months ago)

    CONTRACTOR MUST REPLACE HVAC POST 22 GUARDS BOOTH AT THE ST ELIZABETH CAMPUS Solicitation ID/Procurement Identifier: 47PD0319A0007 Ultimate Completion Date: Mon Aug 08 17:00:00 GMT 2022

    From: Federal Procurement Data System (Federal)
  • J065--Puritan Bennett Ventilators Preventive Maintenance

    Type : Bid Notification
    Due : 07 Jul, 2021 (14 months ago)
    Posted : 15 months ago
    Started : 30 Jun, 2021 (15 months ago)

    TASKS and REQUIREMENTS: Contractor must complete preventive maintenance and repairs (on all equipment listed in table below) to include the following: The Contractor must replace and calibrate oxygen sensors. The Contractor must replace exhalation filters. The Contractor must complete flow sensor calibration and SST after EVO reinstallation. The Contractor must pretest the EVQ before storage.

    From: Federal Government (Federal)
  • J079--Alex/ScrubEX Extended Warranty Preventive Maintenance and Repair

    Type : Bid Notification
    Due : 26 Nov, 2021 (10 months ago)
    Posted : 10 months ago
    Started : 22 Nov, 2021 (10 months ago)

    If support cannot be completed over phone, the Contractor must create a Work order to send technician out to address problem. The Contractor is responsible for updating any firmware that machines listed below when due and also notify Environmental Management Service that update must occur. The Contractor must replace or update any required Hardware required on the machines listed below.

    From: Federal Government (Federal)
  • Bid #PNC2122019B1 - Lime Slaker System

    Type : Bid Notification
    Due : 06 Jan, 2021 (20 months ago)
    Posted : 22 months ago
    Started : 02 Dec, 2020 (22 months ago)

    Contractor must replace two (2) T20-4B2A-BKQ - Single Stage Top Mounted Float Level Switch, one (1) JG Series Gear Mixer Dive Model 3.0, 1/3 HP through 1-1/2 HP-1-115/230,48 inch in length and install two (2) new level sensors , adjust existing weirs for two slurry tanks at WTP 1A and WTP 2A to make existing components operable to meet the desired functions.  

    From: Broward County Board of County Commissioners (County)
  • S--MEDICAL WASTE (SHARPS) DISPOSAL

    Type : Bid Notification
    Due : 20 Mar, 2018 (about 4 years ago)
    Posted : about 4 years ago
    Started : 06 Mar, 2018 (about 4 years ago)

    The Contractor must check, collect and replace containers at all container sites outlined in the survey. Collection services will be once per week. 14. The Contractor must replace all containers that are more than approximately one-third (1/3) full, to ensure no overfills between service days. 15.

    From: Federal Government (Federal)
  • Z2NE--Install Cooling Towers Chemical Treatment (VA-21-00029557)

    Type : Bid Notification
    Due : 13 Apr, 2021 (17 months ago)
    Posted : 18 months ago
    Started : 30 Mar, 2021 (18 months ago)

    This can be omitted from the contract. 2 - We request clarification on existing piping.  The COTR stated no existing piping can be used and that all new piping must be installed for this project.  Please confirm. Correct no existing piping can be used, contractor must replace all piping with new pipe.

    From: Federal Government (Federal)
  • Various Seed Species for the Idaho Military Division

    Type : Bid Notification
    Due : 25 Feb, 2022 (7 months ago)
    Posted : 8 months ago
    Started : 11 Jan, 2022 (8 months ago)

    The Contractor must replace damaged goods with goods that are not damaged and deliver them within five (5) business days of notification by IMD. Does the Bidder agree to this? 1.5 (See Attachment 3 - Specifications) Provide documentation demonstrating that the seeds you are bidding are certified weed free.

    From: Idhao (State)
  • Military Ocean Terminal Concord (MOTCO) Waterfront Water Distribution Project

    Type : Bid Notification
    Due : 12 Feb, 2022 (7 months ago)
    Posted : 8 months ago
    Started : 12 Jan, 2022 (8 months ago)

    Also, the Contractor must connect to a publicly owned pipe (Contra Costa Water District) and a government-owned pipe. As part of the alignment, the Contractor is expected to install a backflow prevention device (BFPD), reducing pressure valve (RPV), air-relief valves, vaults, and numerous gate valves. Lastly, the Contractor must replace fences and construct access roads to get to vaults.

    From: Federal Government (Federal)
Refine your Search
Apply several filters to get precise search results
Filters Applied Clear
Bid NotificationPre-Bid NotificationAwardContractActiveArchived