THE CONTRACTOR SHALL ORDER AND RENEW SERIAL SUBSCRIPTIONS. Solicitation ID/Procurement Identifier: 50310221Q0003 Ultimate Completion Date: Fri Sep 30 17:00:00 GMT 2022
THE CONTRACTOR SHALL ORDER AND RENEW SERIAL SUBSCRIPTIONS. Solicitation ID/Procurement Identifier: 50310221Q0003 Ultimate Completion Date: Fri Sep 30 17:00:00 GMT 2022
The contractor shall order the required equipment as soon as possible and plan their schedule and construction procedures accordingly to ensure that construction is complete within the project’s allowable working days as identified in the project contract documents.
Ensure the Main Substation and its components at Tobyhanna Army Depot remain safe and in proper working order. The contractor shall perform regularly scheduled preventative maintenance and provide detailed reports of all work performed along with recommendations upon completion. All systems shall be in working order at all times.
Contractor shall order and install a new Iowa Standard Pre-cast Pit Latrine according to the Specifications identified in Article 2. Contractor shall clean out any/all waste prior to demolition. The approximate capacity of the pit is 1000 gallons. Bidders can measure for exact waste capacity during the site viewing.
The Contractor will demolish the existing pit latrine. The Contractor shall clean out any/all waste prior to demolition. The approximate capacity of the pit is 500 gallons. The new pit latrine will be a double-hole (112 square feet) pit latrine with ADA access. This Contractor shall order and install a new Iowa Woodduck Pre-cast pit latrine according to specifications.
Contractor shall order and install a new Iowa Standard Pre-cast Pit Latrine according to the Specifications identified in Article 2. Contractor shall clean out any/all waste prior to demolition. The approximate capacity of the pit is 1,000 gallons. Bidders can measure for exact waste capacity during the site viewing.
The contractor shall order for an additional 10% in replacement tiles to allow cutting and matching of pattern repeats as needed as specified in UFGS 09 68 00. The contractor shall furnish and install approximately 300 LF of 6” sanitary ceramic cove base, colors to be selected upon award. The contractor shall furnish and install approximately 8 LF of transition strips.