Type : Bid Notification
See Attachment
See Attachment
Solicitation for repair of B-1 Alarm Control See attached documents for details.
PS216K - COVID VENTILATION/COVID FIRE ALARM SYSTEM/CLIMATE CONTROL Over 4M 24-20490D 03/28/2024 Website 04/05/2024 10:00AM 04/19/2024 11:00AM LEWIS (718)472-8367 rlewis@nycsca.org CIP
The Building Automation System will be modified to support the GPS upgrades and tested to ensure the GPS system status and alarms provide the same functionality as prior to the modifications. The existing UPS synchronizing circuit in the Uninterruptable Power Supply (UPS) Switchgear (SWGR) that checks for synchronization between generator and utility source was never properly documented.
Fire Alarm Control Panel System Replacement Location Colorado Publication Date 06/06/2019 Closing Date 07/11/2019 02:00 PM MDT
Central Nursing Station components will include but not limited to: Terminate 4-conductor on Indicator panel, Delayed Egress activated alarm, Door release activated alarm, IDF Room East & West room will include but not limited to: Two door control board, Lock and Board Power Supply.
Fire Alarm and Access Control Improvement Project Location Colorado Publication Date 05/02/2019 Closing Date 05/29/2019 10:00 AM MDT