Search results for: control board assembly

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 118
  • POWER CONTROL BOARD ASSEMBLY

    Type : Contract

    Due : 01 Mar, 2023 (14 months ago)
    Posted : about 2 years ago
    Started : 22 Sep, 2021 (about 2 years ago)

    POWER CONTROL BOARD ASSEMBLY Solicitation ID/Procurement Identifier: 70Z02321Q70000H00 Ultimate Completion Date: Wed Mar 01 18:00:00 GMT 2023

    From: Federal Procurement Data System (Federal)

  • UPPER CONTROL BOX FOR HAULOTTE CHERRY PICKERS

    Type : Bid Notification

    Due : 20 Apr, 2024 (13 days ago)
    Posted : 14 days ago
    Started : 20 Apr, 2024 (13 days ago)

    1) UPPER CONTROL BOX ASSEMBLY,P/NO.2901003890QTY: 3 (EA) UPPER CONTROL BOARD ASSEMBLY WITH CALIBRATION.MAKE :HAULOTTE. Number F5-Y240405001 Title UPPER CONTROL BOX FOR HAULOTTE CHERRY PICKERS Available Date 18/04/2024 10:05 Due Date 21/04/2024 09:00 Contact Information mahra.albalushi@asyad.om Bid Type RFQ

    From: ASYAD’s Drydock (Co-op)

  • B24001305 LG Control Case Assembly

    Type : Bid Notification

    Due : 16 Jan, 2024 (3 months ago)
    Posted : 3 months ago
    Started : 08 Jan, 2024 (3 months ago)

    B24001305 LG Control Case Assembly Line Items # Title Quantity Unit of Measure Commodity Code 1 Control Case Assembly for LG Model ARUN144DTE4 2 EACH 423690, 423730 Code Table Commodity CodeDescription423690Printed circuit boards merchant wholesalers423730HVAC equipment merchant wholesalers General Quantity 2 Unit of Measure EACH Title Control Case Assembly for LG Model ARUN144DTE4 Description Control case assembly circuit board and assembly for LG

    From: Hawaii (State)

  • Wireless Underwater Tracking System Power Control/Front End Board Assemblies

    Type : Bid Notification

    Due : 26 Oct, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 23 Oct, 2018 (about 5 years ago)

    The Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) is seeking Firm Fixed Price (FFP) quotes for twelve (12) Wireless Underwater Tracking System (WUTS) Power Control/Front End Board Assemblies , as follows: CLIN 0001 WUTS Power Control/Front End Board Assembly (Offerors shall QTY: 12 Each meet the Minimum Specifications and fill out the Minimum Specification Sheet attached to this RFQ).

    From: Federal Government (Federal)

  • ARI Hetra Lifting Systems Repair/Upgrade

    Type : Bid Notification

    Due : 02 Sep, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 18 Aug, 2020 (about 3 years ago)

    The repair and installation upgrade includes preventative maintenance and safety inspection (PM4), AE2 Printed Circuit Board Assembly (106-AR), Control Pads (107AE), 36' Connection Cable W/Metal Connectors (216-18/116-10), and installation.  The Government intends to issue a firm fixed price contract for this service. 

    From: Federal Government (Federal)

  • SOLE SOURCE - GDACB ASSEMBLY

    Type : Bid Notification

    Due : 20 May, 2021 (about 2 years ago)
    Posted : about 3 years ago
    Started : 06 May, 2021 (about 3 years ago)

    N00164-21-Q-0107 – SOLE SOURCE – GDACB ASSEMBLY – FSC 5998- NAICS 334412ISSUE DATE 06 MAY 2021 – CLOSING DATE 20 MAY 2021 – 12:00 PM Eastern TimeITEM DESCRIPTION- Naval Surface Warfare Center (NSWC) Crane has a requirement for GeneratorDiagnostic and Control Board (GDACB) Assemblies from vendor, Gorilla Circuits.The proposed contract action is for the services for which the Government intends to solicit and negotiatewith one source, Gorilla Circuits

    From: Federal Government (Federal)

  • Engine Warning Test Set

    Type : Bid Notification

    Due : 19 Aug, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 29 Jul, 2019 (about 4 years ago)

    and two interconnect cables contained in a combination case.The chassis assembly consists of a front panel connector, on/off switch, two variable controls, two circuit board assemblies, a 1.5-volt size D battery, engine select switch and a power-on indicator lamp.Delivery of EWTSis estimated to be 210 days After Receipt of Order.It is anticipated that the RFP will be released on or around 18 July 2019.The RFP will be posted to the Federal Business

    From: Federal Government (Federal)