Type : Bid Notification
NAVFAC Atlantic seeks to identify potential sources for a construction project for an Entry Control Point facility in Northern Italy, Friuli-Venezia Giulia Region.
NAVFAC Atlantic seeks to identify potential sources for a construction project for an Entry Control Point facility in Northern Italy, Friuli-Venezia Giulia Region.
The general scope of the requirements will be furnishing all labor, equipment, materials, and transportation and performing all required work in accordance with the plans and specifications.The purpose of the requirement will be to construct two Access Control Points (ACPs) in support of the replacement campus for the National Geospatial-Intelligence Agency’s (NGA) 2nd Street, St.
Primary facilities include renovation of Building 5300, construction of an organizational storage building, battery shop with forklift charging stations, standard design Access Control Point/Facility (ACP) to include ACP pavements and barriers, ACP redundant power, special foundations, Intrusion Detection Systems (IDS) installation, Energy Monitoring and Control Systems (EMCS) connections, antiterrorism measures and building information systems.
The 78th Security Forces Squadron is looking to install a stand-alone network video surveillance solutioncapable of providing multiple connections at each Entry Control Facility (ECF)/Access Control Point (ACP),security administration, monitoring and dispatch facilities. The video surveillance software must be capable ofreading license plates, vehicle recognition, personnel recognition, detection of wrong way driving.
Contractor must understand the Unified Facilities Criteria to include but not limited to: UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings, UFC 4-020-01 DoD Security Engineering Facilities Planning Manual, UFC 4-022-01 Security Engineering: Entry control Facilities and Access Control Points, and UFC 4-021-02d. Extensive P6 Scheduling capabilities.e.
Complete design and construction work necessary for a Design-Build (DB) project to construct the site preparations required to support installation of four (4) pre-fabricated components, which will form an Entry Control Point (ECP), Entry Control Facility (ECF), Access Control Point / Commercial Vehicle Inspection Station (CVIS) training simulator to include installation of electrical components and Roadways (with lane striping, directional markings
Construct an Entry Control Point (ECP) and perimeter T-wall for the Exercise Relief Facility (ERF) of AB101.