Type : Bid Notification
OF DOCUMENT BEING CONTINUED: CONTINUED ON NEXT PAGE PAGE 5 OF 22 PAGES SPE7L0-24-T-4476 SECTION B PR: 7007119229 NSN/MATERIAL:2930014233425 ITEM DESCRIPTION PUMP,COOLING SYSTEM PUMP(>,)> COOLING SYSTEM.
OF DOCUMENT BEING CONTINUED: CONTINUED ON NEXT PAGE PAGE 5 OF 22 PAGES SPE7L0-24-T-4476 SECTION B PR: 7007119229 NSN/MATERIAL:2930014233425 ITEM DESCRIPTION PUMP,COOLING SYSTEM PUMP(>,)> COOLING SYSTEM.
Cooling Tower Replacement postdate :- 08-Apr-2024 12:00:00 AM CDT responsedate :- 08-May-2024 2:00:00 PM CDT ( 20d, 0h+ ) description:- For Informationa Purposes Only
Federal Emergency Management Agency (FEMA) Region 10 Federal Regional Center (FRC), located in Bothell, Washington, is requesting a quotation for annual Cooling Tower Water Treatment and Testing services in accordance with the attached Statement of Objectives (SOO).
Removal and replacement of the existing closed-loop, 56 tons cooling tower with a new Direct replacement closed-loop, model number BAC CCT NS- BAC VFL-036-32M. All exterior piping is to be heat-traced and insulated with metal jackets. Work also may include minor alterations to the existing concrete pad as well as all associated piping and electrical requirements.
OF DOCUMENT BEING CONTINUED: CONTINUED ON NEXT PAGE PAGE 6 OF 23 PAGES SPE7L5-24-T-3040 SECTION B PR: 7007280397 NSN/MATERIAL:2930013633096 ITEM DESCRIPTION PUMP,COOLING SYSTEM PUMP, COOLING SYSTEM, ENGINE (PUMP KIT, WATER(>,)> RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS (IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB AT:
J01P4600124 – APC Server Cooling Upgrade, using the Hardware and Associated Equipment and Services 2012, 060B2490022, Functional Areas I, IV, and V. The Response Due Date for this PORFP has been extended.
Removal and replacement of the existing 56-ton closed-loop cooling tower with a new closed-loop direct replacement cooling tower. Exact make and model number for the cooling tower is Baltimore Aircoil, BAC CCT NS- BAC VFL-036-32M. All exterior piping is to be heat-traced and insulated with metal jackets. Work may also include minor alterations to the existing concrete pad as well as all associated piping and electrical requirements.