Type : Bid Notification
Cooling Tower Installation and Rental
Cooling Tower Installation and Rental
Removal and replacement of the existing 56-ton closed-loop cooling tower with a new closed-loop direct replacement cooling tower. Exact make and model number for the cooling tower is Baltimore Aircoil, BAC CCT NS- BAC VFL-036-32M. All exterior piping is to be heat-traced and insulated with metal jackets. Work may also include minor alterations to the existing concrete pad as well as all associated piping and electrical requirements.
Cooling Tower Replacement postdate :- 08-Apr-2024 12:00:00 AM CDT responsedate :- 08-May-2024 2:00:00 PM CDT ( 20d, 0h+ ) description:- For Informationa Purposes Only
141770 - 141770 FAN, ASSEMBLY, COOLING TOWER Description :- THIS RAMP ID REFERS TO A LOS ANGELES DEPARTMENT OF WATER AND POWER (LADWP) BID OPPORTUNITY. ALL SUBMITTAL REQUIREMENTS ARE NOTED ON THE BID DOCUMENT. BIDS ARE TO BE SUBMITTED ELECTRONICALLY THROUGH THE ELECTRONIC REQUEST SOLICIT PROCURE (eRSP) SYSTEM WHICH CAN BE ACCESSED AT THE LINK SHOWN BELOW. MAIL-IN/HARD COPY BID SUBMITTALS WILL NOT BE ACCEPTED.
Sealed bids will be received until 2:00 PM on Tuesday, February 27th, 2024, and will be publicly opened and read aloud in the offices of MSU University Facilities Management, Plew Building, 6th & Grant, Bozeman, Montana, for: Cobleigh Hall Cold Chambers Cooling Tower Replacement, PPA No. 18-2194. Bids shall be submitted on the form provided within the Contract Documents.
05/07/2024 3:00 pm Bid Opening COVB-24-101346 HS Bldg ReRoof and Cooling Tower Replacement Finance Purchasing Conference Room 3096 (DBL)
of new pump house containing installation of new electrical panels, transformer, pumps, variable frequency drives, electric ceiling heater, exhaust fan, including new associated piping, electrical wiring, and controls wiring.Construction of new retaining wall and new fencing surrounding new cooling tower.