Search results for: cooling tower demolition

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 93
  • Request for Quote: 3313101 - Cooling Tower Demolition

    Type : Bid Notification

    Due : 13 Apr, 2023 (12 months ago)
    Posted : 13 months ago
    Started : 06 Apr, 2023 (13 months ago)

    See more details...

    From: University of Tennessee (Higher Education)

  • THIS PROJECT PURPOSE IS FOR THE <b>DEMOLITION</b> AND INSTALLATION OF THE <b>COOLING</b> <b>TOWER</b> SYSTEMS IN TWO DIFFERENT LOCATIONS, THE WILLIAM M. STEGER FEDERAL BLDG. IN TYLER, TX AND THE TOM STAGG UNITED STATES CO...

    THIS PROJECT PURPOSE IS FOR THE DEMOLITION AND INSTALLATION OF THE COOLING TOWER SYSTEMS IN TWO DIFFERENT LOCATIONS, THE WILLIAM M. STEGER ...

    Type : Contract

    Due : 31 Mar, 2025 (in 11 months)
    Posted : 29 days ago
    Started : 02 Apr, 2024 (1 month ago)

    THIS PROJECT PURPOSE IS FOR THE DEMOLITION AND INSTALLATION OF THE COOLING TOWER SYSTEMS IN TWO DIFFERENT LOCATIONS, THE WILLIAM M. STEGER FEDERAL BLDG. IN TYLER, TX AND THE TOM STAGG UNITED STATES CO... Solicitation ID/Procurement Identifier: 47PH0524Q0011 Ultimate Completion Date: Mon Mar 31 17:00:00 GMT 2025

    From: Federal Procurement Data System (Federal)

  • 606934-23 Addendum 3 (Clark Place Rooftop Cooling Tower & Boiler Replacement)

    Type : Bid Notification

    Due : 01 Feb, 2024 (3 months ago)
    Posted : 3 months ago
    Started : 03 Jan, 2024 (4 months ago)

    Work at existing cooling tower consists of preparation of area by demolition of tower, piping, pumps, valves, supports, emergency eyewash and shower station, and appurtenances for installation of cooling tower, pump, basin sweeper, support, controls, piping, valves and devices required for successful operation of the system.

    From: Southern Nevada Regional Housing Authority (State)

  • COVB-24-101346 - Human Services Building Reroof and Cooling Tower Replacement - on behalf of the VBDA

    Type : Bid Notification

    Due : 07 May, 2024 (in 4 days)
    Posted : 27 days ago
    Started : 05 Apr, 2024 (27 days ago)

    Mechanical, electrical and demolition to support the re-roof is also included. Replacement of two rooftop cooling towers, repairs to existing steel platform, temporary cooling tower and piping, and required electrical work. Also includes security fencing around temporary chiller and required demolition. Cooling tower pricing was quoted by RWH Mechanical Sales.

    From: Virginia (State)

  • Abatement and Demolition of Cooling Tower #3 Keele Campus

    Type : Bid Notification

    Due : 09 Nov, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 21 Oct, 2020 (about 3 years ago)

    See more details...

    From: MerX (Federal)

  • Building 34 Chiller Replacement

    Type : Bid Notification

    Due : 05 Mar, 2024 (1 month ago)
    Posted : 3 months ago
    Started : 07 Mar, 2024 (1 month ago)

    Minor modification to the building structure/site work will be needed to allow removal of existing equipment and installation of new equipment in mechanical rooms and outdoor equipment yard including but not limited to: capping roofing penetrations after cooling tower is removed, wall demolition and new work, removing existing concrete equipment pads, and new underground gas piping for gas generator.

    From: Federal Government (Federal)

  • Building 34 Chiller Replacement

    Type : Bid Notification

    Due : 18 Sep, 2023 (7 months ago)
    Posted : 10 months ago
    Started : 20 Sep, 2023 (7 months ago)

    Minor modification to the building structure/site work will be needed to allow removal of existing equipment and installation of new equipment in mechanical rooms and outdoor equipment yard including but not limited to: capping roofing penetrations after cooling tower is removed, wall demolition and new work, removing existing concrete equipment pads, and new underground gas piping for gas generator.

    From: Federal Government (Federal)