Search results for: cooling towers ae design

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 79
  • AE Install Boiler and Upgrade Cooling Tower (Design)

    Type : Pre-Bid Notification

    Due : 26 Apr, 2024 (in 3 days)
    Posted : 1 month ago
    Started : 13 Mar, 2024 (1 month ago)

    Please see attached SF 330 Request for the AE Install Boiler & Upgrade Cooling Tower project at the Marion Campus of the Northern IN VA Healthcare System. Interested AE Firms are encouraged to submit SF 330s for consideration.**NOTE** NAICS has been revised from 541310 to 541330.

    From: Federal Government (Federal)

  • Z--528A8-19-807 DESIGN REPLACE COOLING TOWERS

    Type : Bid Notification

    Due : 13 Feb, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 14 Jan, 2019 (about 5 years ago)

    The A/E will develop the following add alternates in addition to replacing the cooling towers: Alternate #1 will provide piping and associated automatic valving and/or other controls to cross connect the cooling tower basins and cooling tower supply of Cooling Towers #1 & #2 with Cooling Tower #3 to provide improved redundancy and flexible plant operations. Cooling Tower #3 is rated for a nominal 1000 tons capacity.

    From: Federal Government (Federal)

  • C1NB--520-23-2-7080-0002, The Architect Engineer (A/E) to provide services for preparation of design development documents, specifications, working drawi...

    Type : Bid Notification

    Due : 10 Jan, 2023 (15 months ago)
    Posted : 16 months ago
    Started : 08 Dec, 2022 (16 months ago)

    New cooling towers shall be energy efficient with legionella control, reduced drift, water savings, etc. The chilled water lines will tie into the existing chilled water loop for a more robust chilled water system. Building shall be designed such that the architectural style is like other campus buildings.

    From: Federal Government (Federal)

  • ECUP Infrastructure Upgrades 2023

    Type : Bid Notification

    Due : 17 Nov, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 27 Oct, 2021 (about 2 years ago)

    The scope of this project shall assess the structural design of the existing facility and develop design documents for a cooling tower structure to reside where current coal handling equipment resides today.

    From: Ohio Facilities Construction Commission (State)

  • ECUP Infrastructure Upgrades 2023

    Type : Bid Notification

    Due : 17 Nov, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 27 Oct, 2021 (about 2 years ago)

    The scope of this project shall assess the structural design of the existing facility and develop design documents for a cooling tower structure to reside where current coal handling equipment resides today.

    From: Ohio Facilities Construction Commission (State)

  • ECUP Infrastructure Upgrades 2023

    Type : Bid Notification

    Due : 17 Nov, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 27 Oct, 2021 (about 2 years ago)

    The scope of this project shall assess the structural design of the existing facility and develop design documents for a cooling tower structure to reside where current coal handling equipment resides today.

    From: Ohio Facilities Construction Commission (State)

  • ECUP Infrastructure Upgrades 2023

    Type : Bid Notification

    Due : 17 Nov, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 27 Oct, 2021 (about 2 years ago)

    The scope of this project shall assess the structural design of the existing facility and develop design documents for a cooling tower structure to reside where current coal handling equipment resides today.

    From: Ohio Facilities Construction Commission (State)